The web developer has stated that the site must come back online after a hardware failure without administrative intervention.
What is a non-functional requirement?
A company is designing a new vSphere cluster to support a mission-critical application.
* The application requires 100% availability and cannot be restarted to recover from an ESXi host failure.
* The application consists of a group of 16 virtual machines, each with 8 vCPU configured.
Which solution satisfies the availability requirements?
When considering server consolidation, plan on running ___________ vCPUs per core.
A company is consolidating its IT operations efforts by moving the Finance, IT, and QA departments towards a self-service environment, following SDDC best practices.
* All departments have different priorities and expectations for uptime of the required infrastructure and applications.
* Project stakeholders are still discussing final approvals for the budget wan the CFO.
* To drive down the operating cost of the environment, only blade servers will implement this project.
* To ensure business continuity, a colocation provider was chosen to fail over virtual machines.
* The implementation of the project will follow a public reference architecture provided by VMware.
What is the assumption in this scenario?
A solution architect has been tasked with designing a new environment that meets the growing needs of a company, and has obtained this information:
* Each new server will use a single 2-port 10Gb Converged Network Adapter (CNA) for both network and storage access.
* The network team has replaced all network equipment with a 10Gb fabric.
* The new environment will host both web servers and Oracle database servers.
* Resources will not be overcommitted under regular upon at ions to mitigate performance issues.
* The business needs a tool to understand application failures.
* $1million has been budgeted for the data center expansion project.
Based this information, which two statements are requirements for the new design? (Choose two.)