An organization has two vSAN clusters managed by the same vCenter Server, each providing 100TB of storage. The first cluster runs at 75% of its storage capacity, and the second cluster runs at 50% of its storage capacity.
The company also has the following:
* An iSCSI array of 300TB. which runs at 76% of its capacity
* A NAS system of 200TB, which runs at 10% of its capacity
* A Fiber channel (FC) array of 300TB, which runs at 80% of its capacity The administrator is asked to add an additional 25TB of storage to the first cluster. The administrator is also made aware that there is no budget to purchase new hardware and that the vSAN Storage Policy Based Management must be kept in place.
Which storage option will work for this use case?
A company hosts a vSAN 7 stretched cluster for all development workloads. The original sizing of a maximum of 250 concurrent workloads in the vSAN cluster is no longer sufficient and needs to increase to at least 500 concurrent workloads within the next six months.
To meet this demand, the original 8-node (4-4-1) cluster has recently been expanded to 16 nodes (8-8-1).
Which three additional steps should the administrator take to support the current growth plans while minimizing the amount of resources required at the witness site? (Choose three.)
An architect collected the below technical requirements from the customer during a vSAN cluster design workshop:
* Maximize the vSAN datastore usable capacity.
* Deduplication and compression are required to help utilize available capacity efficiency.
* Ensure the highest level of resiliency wherever possible.
Which disk group configuration should the architect include in the design?
for a customer who is planning to use vRealize Automation to provision 600 virtual machines into that cluster, with expected growth up to 1,000 VM. Each VM has a 40GB thick-provisioned disk.
Which flash disk size is required for the cache tier per ESXi node to meet all requirements?
An administrator managing a vSAN cluster of six-nodes with policy FTT-2/RAID-6 decided to put one of the nodes in maintenance mode using the "Full-data migration" option.
What will happen after this action is taken?