An administrator managing a vSAN cluster of six-nodes with policy FTT-2/RAID-6 decided to put one of the nodes in maintenance mode using the "Full-data migration" option.
What will happen after this action is taken?
A customer is planning to migrate their physical Microsoft SQL Server clustered workloads to vSAN enabled vSphere clusters.
The following requirements must be met:
* Each MSSQL cluster is made up of 3 nodes
* Highest possible availability against node failures
* Some of the vSAN clusters will only consume storage
What should the architect recommend?
An administrator wants to enable encryption on an existing vSAN cluster that already contains virtual machines.
Which additional step should the administrator take to ensure no data is lost during the encryption process?
A customer has upgraded to vSAN 7, but there is still an existing legacy host which must be removed from the vSAN cluster.
Which three steps must an administrator take to successfully remove this host from the vSAN cluster? (Choose three.)
An administrator has decided to switch the Preferred Fault Domain in a vSAN stretched cluster.
Resynchronization activity increased drastically after this change.
Which action should the administrator take next time to avoid this problem?