A customer is running a number of compute-intensive application workloads on their existing 4-node vSAN cluster that has resulted in resource contention. To provide additional compute resources, the vSAN administrator has decided to deploy a new 4-node vSAN compute-only cluster so that a HCI Mesh can be configured.
Which three points would the vSAN administrator need to consider before using this configuration? (Choose three.)
A host in the cluster experiences a permanent NIC failure, and the replacement part will not arrive until the next morning. The administrator needs to ensure the availability of the production workload at all times.
Which step should be taken by the administrator to meet this goal?
A vSAN administrator has deployed a new All-Flash vSAN cluster and would like to perform a health test on it to verify that the network performance is meeting the network throughput requirements.
Which tool should be used for this purpose?
Which solution can automate the deployment of a vSAN cluster as part of a full Software-Defined Datacenter?
A vSAN administrator has recently upgraded to vSAN 7.0 U1. The vSAN administrator wants to control the amount of Capacity Reserve to use the underutilized capacity of -140TB in the cluster of 12 vSAN ReadyNodes & 400TB storage for vSAN internal operations.
Which two options should be used to accomplish this goal? (Choose two.)