Based on additional discovery, it was determined that a few critical workloads need to maintain a less than five-minute recovery point objective. Which of the following would be the recommended method to replicate VMware virtual machines?
Which of the following could cause failures to meet the requirement to test gold tier backups?
The customer has asked you to review their existing backup storage. Jobs show the target is the bottleneck.
What steps should you take to improve performance?
What can be done to validate that the design meets target SLAs and does not exceed repository growthprotections?
Based on the requirements, what should be factored into the physical design when implementing the virtual machine replication between sites?