Which of the following is not a responsibility of a pressure vessel inspector according to API-510?
When performing an external inspection on a vessel what consideration should be given to the external insulation?
Describe the process and importance of obtaining third-party verification of pressure vessel inspections under API-510.
According to API-510, which type of record must be permanently maintained for a pressure vessel?
If a vessel is subjected to temperatures above design, what may happen