Which of the following MUST be checked during the validation of software verification capabilities?
Correct Answer: B
Question 207
A large volume of outbound Transmission Control Protocol (TCP) connections from the same source Internet Protocol (IP) address was observed at a satellite office firewall. Which of the following is the MOST likely explanation?
Correct Answer: B
Question 208
The trade-off of increasing safety stock to improve customer fill rate would be a decrease in:
Correct Answer: C
Increasing safety stock to improve customer fill rate would result in a decrease in inventory turns. Inventory turns, or inventory turnover, is a metric measuring how fast the inventory is replaced over time. It is calculated as the cost of goods sold divided by the average value of inventory during the period covered1. A higher inventory turnover ratio indicates that the company sells its inventoryquickly and efficiently, while a lower ratio implies that the company holds too much inventory or has difficulty selling it. Safety stock is an extra quantity of a product stored in the warehouse to prevent an out-of-stock situation. It serves as insurance against fluctuations in demand, longer lead times, and price fluctuations2. Increasing safety stock means increasing the average value of inventory, which lowers the inventory turnover ratio. This also increases the inventory carrying costs, such as storage, insurance, taxes, and obsolescence. Therefore, there is a trade-off between increasing safety stock to improve customer fill rate and decreasing inventory turns to reduce inventory costs3. References: 1 Inventory Turnover Ratio: What It Is, How It Works, and Formula 4 2 What is safety stock? | Definition, Importance, Formula - Zoho 5 3 CPIM Exam References - Association for Supply Chain Management 6
Question 209
In a make-to-stock (MTS) environment, the master production schedule (MPS) Is usually a schedule of which of the following types of items?
Correct Answer: B
In a make-to-stock (MTS) environment, the master production schedule (MPS) is usually a schedule of finished goods items that are ready to be sold to customers. Phantom items, component/subassembly items, and raw material items are not typically scheduled in the MPS, but rather in the material requirements planning (MRP) system, which is driven by the MPS. Reference: CPIM 8.0 Exam Content Manual Preview, page 10, section 4.1.1 CPIM Part 1 Study Guide, page 66, section 4.1.1 CPIM Part 1 Learning System, Module 4, Lesson 1, Topic 1: Master Production Schedule
Question 210
Which of the following BEST effective when protecting against insider threats?