Production activity control in intermittent manufacturing is complex Because of:
Goods are not made continuously as in a flow system but are made at intervals in lots or batches in:
The CPI system is based on the scientific methods. This general method is used to solve many kinds of problems. Which of the following is NOT the out of six steps continuous improvement process?