A consultant is setting up a new Hyper-V cluster. The customer requirements are as follows:
* VMs should automatically failover to another host if the host crashes
* Host CPU and Memory resources should be evenly balanced
* New VMs should be placed on the host with the most resources available Which two Hyper-V features can be used to meet the requirements? (Choose two.)
A consultant deploys a four-node VMware ESXi cluster and vCenter server. An HA/DRS cluster is configured for all four nodes. The customer deploys five new VMs on the cluster.
During the knowledge Transfer, a network cable on one node is removed to demonstrate HA and migration of the VMs to another host. In the HA/DRS cluster settings, the VM Restart Priority for all CVMs is set to Disabled. The customer observes warnings that the CVM on the ejected host is no longer powered on.
Which ESXi HA/DRS cluster setting is missing?
A consultant needs to verify the make and model of the systems that will be imaged with Foundation. The consultant does not have the Bill of Materials (BOM) available to review.
When should the consultant verify the make and model to prepare for the cluster deployment?
A consultant is deploying a two-node cluster at a remote branch office.
Which component must be available to complete cluster configuration?
A customer buys ultimate licensing and wants to use the built-in Nutanix software encryption on their new AHV cluster. The customer needs to create three storage containers and asks the consultant to complete the process as fast as possible.
In which order should the cluster be deployed?
Enter your email address to download Nutanix.NCSC-Level-1.v2022-05-09.q25 Dumps