A prospective customer's migration to their new SAN started six months ago and is still not complete. The VP of IT states the previous migration to the existing SAN took almost eight months to complete.
How should the systems engineer describe Nutanix hardware refreshes to this prospective customer?
A prospect is evaluating vSphere alternatives and has received FUD regarding AHV. The SE gives a demo and provides relevant case studies, but the prospect still requests a POC.
What additional option should the SE recommend to avoid a POC?
An SE is performing workload discovery with an SMB prospect running SQL Server. The databases is less than 1 TB, but its performance and uptime are critical to the prospect's business operations. Sizer sugests using
1065S nodes.
Which aspects of the NX-1065S-G5 would cause an SE to filter out that nodel from Sizer's Automatic configuration? (choose two.)
A customer plans to migrate a business critical, high transaction application to nutanix. Currently the application is running on a physical server with 256GB of RAM and 12 CPU cores at > 80% utilization. To run the VM on a single NUMA node, which processor configuration should the systems engineer recommend for this workload?
An SE is building a solution for Federal government prospect that requires FIPS 140-2 Level 2 encryption for data at rest.
Which two items are required to deliver a solution that meets the encryption standard? (Choose two)