During an initial meeting with a prospect the storage administrator learns that Nutanix does not use RAID for application data. The prospect's storage array is configured with RAID 10 and the full capacity of the array is required. As a result no hot spares have been allocated. The storage administrator must respond immediately to any disk failures, even outside standard business hours.
Which aspect of Nutanix replication factor (RF) will reduce the storage administrator's break/fix burden?
When configuring Prism Central, which two log modules are able to forward messages to an external syslog server? (Choose two.
AN SE determines that a POC is necessary to overcome competitive FUD in an opportunity with an Enterprise account evaluating several HCI solutions. The customer will evaluate three solutions in their datacenter simultaneously over the course of 4 days.
The customer schedules all necessary personnel to be available during this time.
Which two network planning items should the SE determine prior to allocation hardware for the POC?
(Choose two)
A prospective customer wants to refresh their current on-premises infrastructure that. consists of 4 ESXi hosts. each with 20 cores and 512GB of RAM, and 1.2PB of usable SAN storage They have recently renewed their ESXi licensing, and all data must remain within their physical network. They are concerned that a hyperconverged solution will not meet their storage requirements without requiring a significant increase in the number of required ESXi hosts and licenses. Which Nutanix capability should the systems engineer review with the customer?
An administrator needs to move a Nutanix host from one cluster to another.
Which step should the administrator take after evacuating VMs from the host to be moved?