An SE is working with a financial institution prospect on a VDI environment refresh. The institution currently has 5000 named VDI users, with a peak of 2800 concurrent users.
How many VDI VMs does the SE need to size for, factoring in an additional 10% for growth?
A customer needs to image nodes that are either bare metal or require a different hypervisor. Which Nutanix tool should be used?
A customer asks for a quote for a hybrid cluster to run general purpose VMs and an ERP application. The customer has a VSAN ReadyNode quote already and is looking for a comparable Nutanix solution. They share the following bill of materials
* 3 Hosts
* 2x E5-2640v4 CPUs
* 512GB RAM
* 1 x 480GB SSD
* 2 x 8TB HDD
* 2 x 1GB NIC
What are two reasons to avoid sizing to match a competitor's bill of materials? (Choose two)
A Prospective customer asks about failure handling. They have heard all HCI is the same and want to know what happens if 2 nodes fail within 1 hour of each other.
If these is capacity in the cluster. how will this failure scenario be handled?
A prospect is evaluating solutions to support a project. The SE proposes a hybrid model as recommended by size in addition to nutanix, the prospect is evaluating an all flash storage array. The storage administrator is concerned about the performance the hybrid configuration and claims that the flash array is less expensive the it Director sees the benefits of Nutanix but needs to address the team's concerns.
Which two Nutanix features should be discussed to address the concems
of the storage administrator? (Choose two)