An SE needs to size a new project that requires offsite backup but not remote disaster recovery. The prospect requires an RTO of 48 hours, RPO of 4 hours, and the ability to restore from the past 5days of backups. The prospect's data change rate is 1%.

How should the SE configure Sizer for this scenario?
Which two items are considered by Sizer when calculating the required cluster resources with only the Raw Input workload type for multi-VM workload? (Choose two)
A customer has a 3-node cluster configured for RF2 with 100TB of raw disk space. The customer wants to enable Erasure Coding to gain additional usable space. What change will allow EC-X to be enabled?
A customer is running AHV in their Nutanix cluster and wants to provide their users with the ability to restore individual files from snapshots what is the minimum level of licensing that must be applied to the Nutanix cluster ?
Which two VMs require further data analysis to accurately size resources? (Choose two.)