Your client has a requirement that the employee will not get enrolled into the plan for first six months of hire.
Enrollment and accruals will start after the completion of six months. The plan needs to be Front-Loaded.
How will youconfigure this in the system?
An employee is enrolled in the following accrual plans, both of which are linked to the sameabsence type:
Floating Holiday - Priority 100 - (Balance = 2 days), no negative balance allowed.
Vacation - Priority 200 - (Balance = 3 days), negative balance allowed with a limit of 2 days.
Describe how a 7-day absence will be processed using this absence plan setup.
A worker is scheduled to work from Monday to Friday. As an HR administrator, you receive a call from the worker on Friday evening 16-Jun-2017, that they are on vacation from 17-Jun-2017 (Saturday) and will be back at work on 26-Jun-2017 (Monday). The absence type for vacation has no duration formula or plans attached and the duration is measured in Days. There is a calendar exception on 23-Jun-2017 (Friday).
What should be the start date, end date, and the duration of this absence record if the "Schedule nonworking days" isset to "Not enabled"?
Which two statements are true regarding absence qualification plans?
Which is the parameter for limiting processing to a specific set of workers in the Evaluate Absence process?