FreeQAs
 Request Exam  Contact
  • Home
  • View All Exams
  • New QA's
  • Upload
PRACTICE EXAMS:
  • Oracle
  • Fortinet
  • IBM
  • Juniper
  • Microsoft
  • Cisco
  • Citrix
  • CompTIA
  • VMware
  • ISC
  • SAP
  • EMC
  • PMI
  • HP
  • Salesforce
  • Other
  • Oracle
    Oracle
  • Fortinet
    Fortinet
  • IBM
    IBM
  • Juniper
    Juniper
  • Microsoft
    Microsoft
  • Cisco
    Cisco
  • Citrix
    Citrix
  • CompTIA
    CompTIA
  • VMware
    VMware
  • ISC
    ISC
  • SAP
    SAP
  • EMC
    EMC
  • PMI
    PMI
  • HP
    HP
  • Salesforce
    Salesforce
  1. Home
  2. SAP Certification
  3. C_TS414_2023 Exam
  4. SAP.C_TS414_2023.v2025-09-13.q63 Dumps
  • ««
  • «
  • …
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • …
  • »
  • »»
Download Now

Question 31

Your customer automatically create inspection lot for general deliveries in sales and distribution process for its production If QM not started result recording what does the system do in response to a change in the material quality.................

Correct Answer: B
insert code

Question 32

The valuation mode defines the rules for accepting/rejecting inspection characteristics during the inspection results recording. Which valuation mode can be used for a qualitative inspection characteristic? Note: There are 2 correct answers to this question.

Correct Answer: A,C
Valuation modes (set in the sampling procedure, transaction QDV1) for qualitative characteristics include:
* Attributive Inspection Nonconforming Units (A): Used for qualitative characteristics (e.g., pass/fail), counting nonconforming units against a sample to determine acceptance (e.g., ANSI/ASQ Z1.4).
* Manual Valuation (C): Allows manual acceptance/rejection of qualitative results (e.g., "Good" or
"Bad"), a flexible option for subjective assessments.
* Variable Inspection s-Method (B): Applies to quantitative characteristics using statistical variance, not qualitative ones.
* Mean Value Within Tolerance Range (D): Specific to quantitative data, not applicable to qualitative characteristics.
Thus, "Attributive inspection nonconforming units" and "Manual valuation" are the correct answers.
References: SAP Help Portal - "Valuation Modes for Qualitative Characteristics"; SAP S/4HANA QM User Guide - "Sampling Procedures".
insert code

Question 33

Which automatic interface does the system use to record results during production with notification

Correct Answer: A
insert code

Question 34

When the usage decision is made for a stock-relevant inspection lot, a goods movement should take place automatically. Where do you make the required setting?

Correct Answer: D
Automatic goods movement during usage decision (UD, transaction QA11) for stock-relevant lots (e.g., type
01) is configured in:
* In the Inspection Type (D): In Customizing (SPRO > QM > Quality Inspection > Inspection Lot Creation > Maintain Inspection Types), the inspection type (e.g., 01) has a "Automatic UD" and "Stock Posting" setting. Activating this links UD codes to movement types (e.g., 321 for quality to unrestricted), enabling automatic stock updates.
* Codes in the Selected Set (A): Selected sets (transaction QS51) define UD codes but don't control movements.
* Codes in the Code Group (B): Code groups (transaction QS41) are for catalog organization, not stock movement settings.
* Movement Type (C): Movement types (e.g., 321) are used but assigned via inspection type settings, not directly configured there.
Thus, "In the inspection type" is the correct answer.References: SAP Help Portal - "Automatic Stock Posting in QM"; SAP S/4HANA QM Customizing Guide - "Inspection Types".
insert code

Question 35

You have entered a priority during creation of a notification. What action will this trigger in the system?

Correct Answer: C
Entering a priority (e.g., "High") in a quality notification (transaction QM01):
* Calculate the Notification Start and Finish Dates (C): The priority (set in Customizing, SPRO > QM
> Quality Notifications > Define Priorities) triggers the system to calculate required start and end dates based on response times linked to the priority (e.g., 24 hours for "High"). This is standard behavior for time-sensitive notifications.
* Create Activities Automatically (A): Activities are logged manually or via action boxes, not priority.
* Create Tasks Automatically (B): Tasks require a response profile, not just priority.
* Calculate Malfunction Dates (D): Malfunction dates are specific to equipment notifications (e.g., F2), not driven by priority alone.
Thus, "Calculate the notification start and finish dates" is the correct answer.References: SAP Help Portal -
"Priorities in QM Notifications"; SAP S/4HANA QM User Guide - "Notification Processing".
insert code
  • ««
  • «
  • …
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • …
  • »
  • »»
[×]

Download PDF File

Enter your email address to download SAP.C_TS414_2023.v2025-09-13.q63 Dumps

Email:

FreeQAs

Our website provides the Largest and the most Latest vendors Certification Exam materials around the world.

Using dumps we provide to Pass the Exam, we has the Valid Dumps with passing guranteed just which you need.

  • DMCA
  • About
  • Contact Us
  • Privacy Policy
  • Terms & Conditions
©2026 FreeQAs

www.freeqas.com materials do not contain actual questions and answers from Cisco's certification exams.