FreeQAs
 Request Exam  Contact
  • Home
  • View All Exams
  • New QA's
  • Upload
PRACTICE EXAMS:
  • Oracle
  • Fortinet
  • IBM
  • Juniper
  • Microsoft
  • Cisco
  • Citrix
  • CompTIA
  • VMware
  • ISC
  • SAP
  • EMC
  • PMI
  • HP
  • Salesforce
  • Other
  • Oracle
    Oracle
  • Fortinet
    Fortinet
  • IBM
    IBM
  • Juniper
    Juniper
  • Microsoft
    Microsoft
  • Cisco
    Cisco
  • Citrix
    Citrix
  • CompTIA
    CompTIA
  • VMware
    VMware
  • ISC
    ISC
  • SAP
    SAP
  • EMC
    EMC
  • PMI
    PMI
  • HP
    HP
  • Salesforce
    Salesforce
  1. Home
  2. USGBC Certification
  3. LEED-AP-BD-C Exam
  4. USGBC.LEED-AP-BD-C.v2024-05-18.q93 Dumps
  • ««
  • «
  • …
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • …
  • »
  • »»
Download Now

Question 66

A project is designed to remodel an existing warehouse into multi-family housing. The exterior facade of the warehouse will remain, but 40% of the interior will be demolished and replaced for interior new construction.
New materials will be used for the new construction. To achieve points in the Materials and Resources Credit, Building Life-Cycle Impact Reduction, which credit path option would apply?

Correct Answer: D
Explanation
This option applies to projects that renovate an existing building that meets the definition of abandoned or blighted, and use new materials for at least 50% of the surface area. The project meets these criteria, as the warehouse is an existing building that is presumably abandoned or blighted, and the new construction will use new materials for 40% of the interior and some of the exterior. References: LEED v4: Building Design + Construction Guide, Materials and Resources Credit, Building Life-Cycle Impact Reduction, Option 4:
Renovation of Abandoned or Blighted Building
------
insert code

Question 67

What is the definition of the evapotranspiration rate?

Correct Answer: D
Explanation
The evapotranspiration rate is the amount of water loss in a vegetated surface in units of water depth, such as millimeters or inches. It is a measure of the water demand of the plants and the climate conditions. It is used to calculate the baseline water use for irrigation in the Outdoor Water Use Reduction credit.
References:
*LEED v4 BD+C Reference Guide, page 5381
*Outdoor Water Use Reduction Credits in LEED v4 - HydroPoint2
insert code

Question 68

Which of the following is required to earn Energy and Atmosphere Credit, Renewable Energy Production if using aSolar Photovoltaic System?

Correct Answer: D
Explanation
The Energy and Atmosphere Credit, Renewable Energy Production rewards projects that use renewable energy systems to offset building energy costs1. According to the LEED Reference Guide for Building Design and Construction2, the credit has two options: Option 1. On-Site Renewable Energy and Option 2. Off-Site Renewable Energy. Option 1 requires the project to use renewable energy systems that are located on the project site and that produce electricity or thermal energy for the project. The amount of renewable energy production is calculated based on the percentage of the annual energy cost that is offset by the renewable energy systems. Option 2 requires the project to use renewable energy systems that are located off the project site and that are owned by the project or have a long-term contract with the project. The amount of renewable energy production is calculated based on the percentage of the annual energy use that is offset by the renewable energy systems.
Therefore, among the given options, only Option D is relevant to the credit requirements, as it implies that the solar photovoltaic system is located on the project site and that the produced electricity is consumed by the project. The other options, such as carbon offsets, daylighting strategies, and passive solar strategies, are not directly related to the credit requirements, although they may have other benefits for the project.
References:
* Renewable Energy Production | U.S. Green Building Council
* LEED Reference Guide for Building Design and Construction v4
* Solar Photovoltaic Technology Basics | Department of Energy
* Photovoltaic system - Wikipedia
insert code

Question 69

Which energy efficient lamp type is free from mercury?

Correct Answer: C
Explanation
Light Emitting Diode (LED) is an energy efficient lamp type that is free from mercury. Mercury is a toxic metal that can pose health and environmental risks when released from broken or discarded lamps.LED lamps do not contain mercury or other hazardous substances, and they also have longer lifespans and lower energy consumption than other lamp types12.References:No mercury Lights | LEEDuser;LED Lighting
insert code

Question 70

What is the minimum number of members of the integrated project team for the Integrative Process Prerequisite, Integrative Project Planning and Design?

Correct Answer: C
Explanation
According to the LEED Reference Guide for Building Design and Construction1, the Integrative Process Prerequisite, Integrative Project Planning and Design, requires the project to assemble an integrated project team that includes at least four key project team members, in addition to the owner or owner's representative.
The key project team members are those who have the authority and responsibility to make design decisions and implement them during construction. The integrated project team should include professionals from different disciplines, such as architecture, engineering, landscape, interior design, construction, commissioning, operations, and maintenance. The integrated project team should collaborate throughout the project phases, from discovery to occupancy, to achieve the project goals and optimize the building performance.
References:
* LEED Reference Guide for Building Design and Construction v4
* Integrated Product Team (IPT) - AcqNotes
* The Power of an Integrated Project Team Process - Little
insert code
  • ««
  • «
  • …
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • …
  • »
  • »»
[×]

Download PDF File

Enter your email address to download USGBC.LEED-AP-BD-C.v2024-05-18.q93 Dumps

Email:

FreeQAs

Our website provides the Largest and the most Latest vendors Certification Exam materials around the world.

Using dumps we provide to Pass the Exam, we has the Valid Dumps with passing guranteed just which you need.

  • DMCA
  • About
  • Contact Us
  • Privacy Policy
  • Terms & Conditions
©2026 FreeQAs

www.freeqas.com materials do not contain actual questions and answers from Cisco's certification exams.