FreeQAs
 Request Exam  Contact
  • Home
  • View All Exams
  • New QA's
  • Upload
PRACTICE EXAMS:
  • Oracle
  • Fortinet
  • IBM
  • Juniper
  • Microsoft
  • Cisco
  • Citrix
  • CompTIA
  • VMware
  • ISC
  • SAP
  • EMC
  • PMI
  • HP
  • Salesforce
  • Other
  • Oracle
    Oracle
  • Fortinet
    Fortinet
  • IBM
    IBM
  • Juniper
    Juniper
  • Microsoft
    Microsoft
  • Cisco
    Cisco
  • Citrix
    Citrix
  • CompTIA
    CompTIA
  • VMware
    VMware
  • ISC
    ISC
  • SAP
    SAP
  • EMC
    EMC
  • PMI
    PMI
  • HP
    HP
  • Salesforce
    Salesforce
  1. Home
  2. USGBC Certification
  3. LEED-AP-BD-C Exam
  4. USGBC.LEED-AP-BD-C.v2024-05-18.q93 Dumps
  • «
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • …
  • »
  • »»
Download Now

Question 16

In Sustainable Sites Credit, Light Pollution Reduction, which factor is included in the lamp lumen uplight calculation?

Correct Answer: D
Explanation
This factor is included in the lamp lumen uplight calculation, because it represents the amount of light that is emitted downward by the fixture, which does not contribute to light pollution1. The lamp lumen uplight calculation is used to determine the percentage of total luminaire lumens emitted above horizontal, which must not exceed the maximum allowed values for each lighting zone2.
References: = [LEED v4: Building Design + Construction Guide], SSc6 step by step instructions - BuildingGreen.
insert code

Question 17

For major renovation and new construction projects, the required energy and water-related system analyses should be the same except for

Correct Answer: C
Explanation
For major renovation and new construction projects, the required energy and water-related system analyses should be the same except for plug and process load needs. Plug and process loads are the electrical loads that are not related to lighting, heating, ventilation, and air conditioning (HVAC)systems, such as computers, appliances, equipment, and machinery. Plug and process load needs may vary depending on the type and function of the building, and they can have a significant impact on the energy performance and demand of the building. Therefore, the project team should analyze the plug and process load needs for each project and design strategies to reduce or optimize them. The other factors, such as site conditions, massing and orientation, and building envelope performance, are common to both major renovation and new construction projects, and they should be analyzed in the same way for both types of projects.
References:
*LEED v4 Reference Guide for Building Design and Construction, Integrative Process Credit: Integrative Process, page 811
*Integrative Process Worksheet2
insert code

Question 18

In a large industrial or commercial building, which energy end uses are classified as systems composed of discrete pieces of equipment that can be metered together for the purposes of Energy and Atmosphere Credit, Advanced Energy Metering?

Correct Answer: D
Explanation
A condenser water system with a cooling tower and condenser water pumps is classified as a system composed of discrete pieces of equipment that can be metered together for the purposes of Energy and Atmosphere Credit, Advanced Energy Metering. This is because the condenser water system is a single energy end use that serves a specific function and can be isolated from other systems1. HVAC air system, electrical lighting system, and water flow system are not considered as single energy end uses, but rather as multiple energy end uses that serve different functions and cannot be easily isolated2.
References:
*LEED v4 for Building Design and Construction, p. 415
*Advanced Energy Metering, p. 2
insert code

Question 19

Which of the following will result in a higher demand for potable water use in irrigation?

Correct Answer: C
Explanation
The answer is C. A high evapotranspiration rate will result in a higher demand for potable water use in irrigation. Evapotranspiration is the process by which water is transferred from the land to the atmosphere by evaporation from the soil and other surfaces and by transpiration from plants. The higher the evapotranspiration rate, the more water is lost from the soil and plants, and the more irrigation is needed to replenish the moisture. The other options will not increase the demand for potable water use in irrigation. A sparsely planted area will have less vegetation and less transpiration, reducing the water demand. A drip irrigation system will deliver water directly to the plant roots, minimizing evaporation and runoff, and saving water. A rainwater harvesting system will collect and store rainwater for irrigation, reducing the reliance on potable water sources.For more information on outdoor water use reduction and irrigation efficiency, you can refer to the LEED v4 Reference Guide for Building Design and Construction1or the WaterSense Water Budget Tool2.
insert code

Question 20

LEED project boundaries that include multiple similar buildings which are all eligible for certification can be registered as which of the following?

Correct Answer: B
Explanation
LEED project boundaries that include multiple similar buildings which are all eligible for certification can be registered as a group project. A group project allows multiple buildings (or interior spaces within multiple buildings) on a shared site to be certified as a single LEED project. These projects must meet the criteria outlined in the LEED Campus Guidance for Projects on a Shared Site, such as having the same construction contract, ownership, management, space type, rating system, and compliance paths. A group project will receive one certification and rating for the entire group.References:Group Projects (previously Multiple Building Projects), CAGBC News, September 1, 2020.
insert code
  • «
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • …
  • »
  • »»
[×]

Download PDF File

Enter your email address to download USGBC.LEED-AP-BD-C.v2024-05-18.q93 Dumps

Email:

FreeQAs

Our website provides the Largest and the most Latest vendors Certification Exam materials around the world.

Using dumps we provide to Pass the Exam, we has the Valid Dumps with passing guranteed just which you need.

  • DMCA
  • About
  • Contact Us
  • Privacy Policy
  • Terms & Conditions
©2026 FreeQAs

www.freeqas.com materials do not contain actual questions and answers from Cisco's certification exams.