FreeQAs
 Request Exam  Contact
  • Home
  • View All Exams
  • New QA's
  • Upload
PRACTICE EXAMS:
  • Oracle
  • Fortinet
  • Juniper
  • Microsoft
  • Cisco
  • Citrix
  • CompTIA
  • VMware
  • SAP
  • EMC
  • PMI
  • HP
  • Salesforce
  • Other
  • Oracle
    Oracle
  • Fortinet
    Fortinet
  • Juniper
    Juniper
  • Microsoft
    Microsoft
  • Cisco
    Cisco
  • Citrix
    Citrix
  • CompTIA
    CompTIA
  • VMware
    VMware
  • SAP
    SAP
  • EMC
    EMC
  • PMI
    PMI
  • HP
    HP
  • Salesforce
    Salesforce
  1. Home
  2. USGBC Certification
  3. LEED-AP-BD-C Exam
  4. USGBC.LEED-AP-BD-C.v2025-12-01.q236 Dumps
  • «
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • …
  • »
  • »»
Download Now

Question 11

What standard should an engineer use when establishing minimum ventilation rates for a new mechanically ventilated space to earn Indoor Environmental Quality, Minimum Indoor Air Quality Performance?

Correct Answer: B
Explanation
ASHRAE 62.1-2010 is the standard that an engineer should use when establishing minimum ventilation rates for a new mechanically ventilated space to earn Indoor Environmental Quality, Minimum Indoor Air Quality Performance. This is the standard referenced by the LEED v4 BD+C Reference Guide for this prerequisite.
Local building code, International Mechanical Code 2012, and the ventilation code requiring the greatest volume of outside air are not acceptable alternatives for this prerequisite.References: LEED v4 BD+C Reference Guide, Indoor Environmental Quality Category, EQp Minimum Indoor Air Quality Performance, page 674.
insert code

Question 12

How is the distance between the project site and the manufacturing location determined for Materials and Resources Credit. Building Disclosure and Optimization - Sourcing of Raw Materials. Option 2. Leadership Extraction Practices?

Correct Answer: B
The distance between the project site and the manufacturing location is determined by the straight line distance. This is because the LEED v4 Reference Guide for Building Design and Construction states that the distance should be measured as the crow flies1. The straight line distance is the shortest distance between two points on a plane, regardless of the mode of transportation or the road conditions. The image that you sent shows the straight line distance between the project site and the manufacturing location as the line segment AB.
References:
* LEED v4 Reference Guide for Building Design and Construction, Materials and Resources Credit:
Building Product Disclosure and Optimization - Sourcing of Raw Materials, page 551
insert code

Question 13

Which item is included in the reuse calculation for Materials and Resources Credit, Building Life-Cycle Impact Reduction?

Correct Answer: A
Explanation
The reuse calculation for MR Credit Building Life-Cycle Impact Reduction includes the surface area of structural elements that are reused in place or salvaged and reinstalled, such as floor decking, columns, beams, and roof decking. Exterior glazing and plumbing fixtures are not considered structural elements and are not included in the reuse calculation. Asbestos insulation is a hazardous material that should be removed and disposed of properly, not reused. References: MR Credit Building Life-Cycle Impact Reduction, LEED v4 Reference Guide for Building Design and Construction123
insert code

Question 14

What is the minimum number of members of the integrated project team for the Integrative Process Prerequisite, Integrative Project Planning and Design?

Correct Answer: C
Explanation
According to the LEED Reference Guide for Building Design and Construction1, the Integrative Process Prerequisite, Integrative Project Planning and Design, requires the project to assemble an integrated project team that includes at least four key project team members, in addition to the owner or owner's representative.
The key project team members are those who have the authority and responsibility to make design decisions and implement them during construction. The integrated project team should include professionals from different disciplines, such as architecture, engineering, landscape, interior design, construction, commissioning, operations, and maintenance. The integrated project team should collaborate throughout the project phases, from discovery to occupancy, to achieve the project goals and optimize the building performance.
References:
* LEED Reference Guide for Building Design and Construction v4
* Integrated Product Team (IPT) - AcqNotes
* The Power of an Integrated Project Team Process - Little
insert code

Question 15

Which of the following projects is eligible to pursue the Energy and Atmosphere Prerequisite, Minimum Energy Performance, Option 2. Prescriptive Compliance: ASHRAE 50% Advanced Energy Design Guide?

Correct Answer: C
The Energy and Atmosphere Prerequisite, Minimum Energy Performance, Option 2. Prescriptive Compliance: ASHRAE 50% Advanced Energy Design Guide allows projects to follow the recommendations of the ASHRAE 50% Advanced Energy Design Guides (AEDGs) for different building types and climate zones. The AEDGs provide design guidance for buildings that use 50% less energy than those built to the requirements of the ANSI/ASHRAE/IES Standard 90.1-2004 commercial code1. However, not all building types and sizes are covered by the AEDGs. According to the LEED Reference Guide for Building Design and Construction2, the following building types and sizes are eligible for this option:
Small to Medium Office buildings up to 100,000 ft2 (9 290 m2)
Medium to Large Retail buildings up to 100,000 ft2 (9 290 m2)
K-12 School buildings up to 200,000 ft2 (18 580 m2)
Warehouse and Distribution Center buildings up to 500,000 ft2 (46 450 m2) Therefore, among the given options, only the school project is eligible to pursue this option, as it falls within the size limit for the K-12 School AEDG3.
Reference:
LEED Reference Guide for Building Design and Construction v4
Minimum Energy Performance - ASHRAE 90.1 - 2010
ASHRAE 50% Advanced Energy Design Guide for K-12 School Buildings
Advanced Energy Design Guides | Department of Energy
insert code
  • «
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • …
  • »
  • »»
[×]

Download PDF File

Enter your email address to download USGBC.LEED-AP-BD-C.v2025-12-01.q236 Dumps

Email:

FreeQAs

Our website provides the Largest and the most Latest vendors Certification Exam materials around the world.

Using dumps we provide to Pass the Exam, we has the Valid Dumps with passing guranteed just which you need.

  • DMCA
  • About
  • Contact Us
  • Privacy Policy
  • Terms & Conditions
©2026 FreeQAs

www.freeqas.com materials do not contain actual questions and answers from Cisco's certification exams.