FreeQAs
 Request Exam  Contact
  • Home
  • View All Exams
  • New QA's
  • Upload
PRACTICE EXAMS:
  • Oracle
  • Fortinet
  • Juniper
  • Microsoft
  • Cisco
  • Citrix
  • CompTIA
  • VMware
  • SAP
  • EMC
  • PMI
  • HP
  • Salesforce
  • Other
  • Oracle
    Oracle
  • Fortinet
    Fortinet
  • Juniper
    Juniper
  • Microsoft
    Microsoft
  • Cisco
    Cisco
  • Citrix
    Citrix
  • CompTIA
    CompTIA
  • VMware
    VMware
  • SAP
    SAP
  • EMC
    EMC
  • PMI
    PMI
  • HP
    HP
  • Salesforce
    Salesforce
  1. Home
  2. USGBC Certification
  3. LEED-AP-BD-C Exam
  4. USGBC.LEED-AP-BD-C.v2025-12-01.q236 Dumps
  • ««
  • «
  • …
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • …
  • »
  • »»
Download Now

Question 26

The gross floor area of a LEED project should be no less than what percent of the gross land area within the LEED project boundary?

Correct Answer: B
According to the LEED BD+C Minimum Program Requirements (MPRs), a project's gross floor area must be no less than 1% of the gross land area within the LEED project boundary. This requirement ensures that the project includes a building component that is significant enough to warrant LEED certification, distinguishing it from projects that are primarily land developments without substantial building structures.
insert code

Question 27

What is the minimum gross floor area required for a Building Design and Construction project to be eligible for certification?

Correct Answer: D
According to the LEED minimum program requirements, the LEED project must include a minimum of 1000 square feet (93 square meters) of gross floor area for the LEED BD+C and LEED O+M rating systems1.
insert code

Question 28

What is a viable strategy for optimizing open space under Sustainable Sites Credit, Open Space? U

Correct Answer: D
Explanation
Coordinating open space features early during the site planning phase is a viable strategy for optimizing open space under Sustainable Sites Credit, Open Space. This can help to preserve natural habitats, reduce heat island effects, and enhance human health and well-being. The credit requires that the project provide outdoor space that is at least 30% of the total site area, and that at least 25% of that outdoor space meets certain criteria for vegetated, pervious, or shaded areas. References:
* LEED credit library: This is the USGBC's comprehensive listing of all the LEED credits available in pursuing certification for your project. The credit library contains the requirements and guidance for each credit, as well as the web-based reference guide for the Building Design and Construction rating system.
* Open Space: This is the specific credit page for the Open Space credit under the Sustainable Sites category. It provides the intent, requirements, and strategies for achieving the credit, as well as the number of points available and the applicable project types.
* Step by Step Approach to Comply with the Open Space Credit in LEED v4: This is a blog post that explains the steps and calculations involved in complying with the Open Space credit. It also provides some examples and tips for optimizing open space design.
insert code

Question 29

A new commercial building is being designed to use small capacity air handling units. To meet the requirements of the Carbon Dioxide Monitoring strategy in the Indoor Environmental Quality Credit, Enhanced Indoor Environmental Quality Strategies, where would CO2 monitors need to be located?

Correct Answer: B
According to the LEED v4 Reference Guide for Building Design and Construction, the Carbon Dioxide Monitoring strategy requires CO2 monitors to be located in each densely occupied space, which is defined as a space with a design occupant density of 25 people or more per 1,000 square feet (93 square meters). This strategy is intended to provide feedback on ventilation system performance and indoor air quality12 Reference: 1: LEED v4 Reference Guide for Building Design and Construction, Indoor Environmental Quality Credit: Enhanced Indoor Air Quality Strategies, Option 2: Additional Enhanced IAQ Strategies, Strategy 3: Carbon Dioxide Monitoring, page 704. 2: LEED v4 Reference Guide for Building Design and Construction, Glossary, page 1019.
insert code

Question 30

An HVAC system consists of an air handler supplying conditioned air (mixture of return air andoutdoor air) to anoffice, corridor, conference room and lobby. For Indoor Environmental Quality Prerequisite, Minimum Indoor AirQuality Performance, the ventilation rate procedure calculations must be based upon what HVAC systemconfiguration?

Correct Answer: B
Explanation
A multiple-zone system is a system that has one or more air handlers supplying conditioned air to more than one zone. A zone is a space or group of spaces within a building with heating and cooling requirements that are sufficiently similar so that desired conditions (e.g., temperature) can be maintained throughout using a single controlling device. The ventilation rate procedure calculations must be based on the multiple-zone system configuration because the HVAC system in the question serves different zones with different ventilation requirements.References: LEED v4 Reference Guide for Building Design and Construction, p.6881; ASHRAE Standard 62.1-2010, Section 6.2.52
insert code
  • ««
  • «
  • …
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • …
  • »
  • »»
[×]

Download PDF File

Enter your email address to download USGBC.LEED-AP-BD-C.v2025-12-01.q236 Dumps

Email:

FreeQAs

Our website provides the Largest and the most Latest vendors Certification Exam materials around the world.

Using dumps we provide to Pass the Exam, we has the Valid Dumps with passing guranteed just which you need.

  • DMCA
  • About
  • Contact Us
  • Privacy Policy
  • Terms & Conditions
©2026 FreeQAs

www.freeqas.com materials do not contain actual questions and answers from Cisco's certification exams.