FreeQAs
 Request Exam  Contact
  • Home
  • View All Exams
  • New QA's
  • Upload
PRACTICE EXAMS:
  • Oracle
  • Fortinet
  • Juniper
  • Microsoft
  • Cisco
  • Citrix
  • CompTIA
  • VMware
  • SAP
  • EMC
  • PMI
  • HP
  • Salesforce
  • Other
  • Oracle
    Oracle
  • Fortinet
    Fortinet
  • Juniper
    Juniper
  • Microsoft
    Microsoft
  • Cisco
    Cisco
  • Citrix
    Citrix
  • CompTIA
    CompTIA
  • VMware
    VMware
  • SAP
    SAP
  • EMC
    EMC
  • PMI
    PMI
  • HP
    HP
  • Salesforce
    Salesforce
  1. Home
  2. USGBC Certification
  3. LEED-AP-BD-C Exam
  4. USGBC.LEED-AP-BD-C.v2025-12-01.q236 Dumps
  • ««
  • «
  • …
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • …
  • »
  • »»
Download Now

Question 191

What is the average flush rate for a dual flush toilet with a high flush rate of 1.6 gpf (6 lpf) and a low flush rate of 1.05 gpf (4 lpf)?

Correct Answer: B
The average flush rate for a dual flush toilet is calculated by weighting the high and low flush rates according to the frequency of use. According to the LEED Reference Guide for Building Design and Construction1, the frequency of use for male and female occupants is assumed to be as follows:
Male full flush: 1 time per day
Female full flush: 1 time per day
Male low flush: 2 times per day
Female low flush: 2 times per day
Therefore, the average flush rate for a dual flush toilet with a high flush rate of 1.6 gpf (6 lpf) and a low flush rate of 1.05 gpf (4 lpf) is:
6(1×1.6)+(1×1.6)+(2×1.05)+(2×1.05)=1.19 gpf(4.5 lpf)
Reference:
LEED Reference Guide for Building Design and Construction v4
Dual toilet flush rate average | LEEDuser
Dual Flush vs Single Flush Toilet: The Complete Comparison Guide
What Is a Dual Flush Toilet? - The Spruce
insert code

Question 192

What percentage of a building's surface area may be excluded from the calculation for Materials and Resources Credit, Building Life-Cycle Impact Reduction, Option 2. Renovation of Abandoned or Blighted Buildings because of deterioration or damage when maintaining existing building structure, enclosure and interior structural elements?

Correct Answer: C
For the Materials and Resources Credit, Building Life-Cycle Impact Reduction, Option 2. Renovation of Abandoned or Blighted Buildings, up to 25% of the building surface area may be excluded from the credit calculation due to deterioration or damage1.
insert code

Question 193

A Photovoltaic (PV) system was installed on a 35,000 ft2 (3 252 m2) project. What actions need to take place in order to meet compliance for Energy and Atmosphere Prerequisite, Fundamental Commissioning (Cx) and Verification?

Correct Answer: C
The correct answer is C, the Cx agent for the project must conduct or oversee the Cx of the PV system.
According to the LEED v4 Reference Guide for Building Design and Construction, the Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification, requires that all energy-related systems, including renewable energy systems such as PV, be commissioned by an independent commissioning agent (CxA) or a qualified member of the project team who reports to the owner. The CxA or the qualified team member must perform or oversee all commissioning activities, including developing a commissioning plan, reviewing design documents and submittals, verifying installation and performance, and preparing a commissioning report12 References: 1: LEED v4 Reference Guide for Building Design and Construction, Energy and Atmosphere Prerequisite: Fundamental Commissioning and Verification, page 562.
2: LEED v4 Reference Guide for Building Design and Construction, Glossary, page 1020.
insert code

Question 194

Which of the following project team members should be integrated early into the design phase to assist with earning the Materials and Resources Prerequisite, Construction and Demolition Waste Management Planning?

Correct Answer: B
Explanation
Contractor
The contractor is the project team member who should be integrated early into the design phase to assist with earning the Materials and Resources Prerequisite, Construction and Demolition Waste Management Planning.
The contractor is responsible for implementing the waste management plan, which includes estimating the types and quantities of waste materials, identifying the diversion strategies, selecting the waste haulers and recyclers, tracking and documenting the waste diversion performance, and training the subcontractors and workers. The contractor can provide valuable input on how to reduce, reuse, and recycle the construction and demolition waste, as well as identify potential challenges and opportunities for achieving the prerequisite requirements.
References:
* Reference Guide for Building Design and Construction v4 - Pages 263-2641
* LEED Certification and Sustainable Construction Waste Management1
insert code

Question 195

Massing and orientation in Integrative Process Credit. Integrative Process evaluates how rotating the building
90 degrees affects

Correct Answer: A
Explanation
Massing and orientation are important factors that affect the energy performance of a building. Massing refers to the shape and size of the building, and orientation refers to the direction that the building faces. By rotating the building 90 degrees, the project team can evaluate how the change in orientation affects the energy loads of the building, such as heating, cooling, and lighting. For example, a building that faces south may receive more solar heat gain and daylight than a building that faces north, which may reduce the need for artificial lighting and heating, but increase the need for cooling and shading. The project team can use the results of the analysis to optimize the massing and orientation of the building to achieve the best energy performance.
References:
* LEED v4 Reference Guide for Building Design and Construction, Integrative Process Credit: Integrative Process, page 811
* Integrative Process Worksheet2
insert code
  • ««
  • «
  • …
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • …
  • »
  • »»
[×]

Download PDF File

Enter your email address to download USGBC.LEED-AP-BD-C.v2025-12-01.q236 Dumps

Email:

FreeQAs

Our website provides the Largest and the most Latest vendors Certification Exam materials around the world.

Using dumps we provide to Pass the Exam, we has the Valid Dumps with passing guranteed just which you need.

  • DMCA
  • About
  • Contact Us
  • Privacy Policy
  • Terms & Conditions
©2026 FreeQAs

www.freeqas.com materials do not contain actual questions and answers from Cisco's certification exams.