FreeQAs
 Request Exam  Contact
  • Home
  • View All Exams
  • New QA's
  • Upload
PRACTICE EXAMS:
  • Oracle
  • Fortinet
  • Juniper
  • Microsoft
  • Cisco
  • Citrix
  • CompTIA
  • VMware
  • SAP
  • EMC
  • PMI
  • HP
  • Salesforce
  • Other
  • Oracle
    Oracle
  • Fortinet
    Fortinet
  • Juniper
    Juniper
  • Microsoft
    Microsoft
  • Cisco
    Cisco
  • Citrix
    Citrix
  • CompTIA
    CompTIA
  • VMware
    VMware
  • SAP
    SAP
  • EMC
    EMC
  • PMI
    PMI
  • HP
    HP
  • Salesforce
    Salesforce
  1. Home
  2. USGBC Certification
  3. LEED-AP-BD-C Exam
  4. USGBC.LEED-AP-BD-C.v2025-12-01.q236 Dumps
  • ««
  • «
  • …
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • …
  • »
  • »»
Download Now

Question 206

Increasing which of the following variables will require an increase in the outdoor airflow rate under Indoor Environmental Quality Prerequisite, Minimum Indoor Air Quality Performance?

Correct Answer: B
The outdoor airflow rate is the amount of outdoor air that is supplied to the building by the ventilation system to dilute indoor air pollutants and provide fresh air for the occupants. The outdoor airflow rate depends on the ventilation standard that the project follows, which can be either ASHRAE 62.1-2010 or CEN Standard EN 15251-20071. Both standards specify the minimum outdoor airflow rate per person and per unit area for different occupancy types and zones. Therefore, increasing the number of occupants will require an increase in the outdoor airflow rate to maintain the minimum ventilation level. The other variables, such as supply air velocity, system ventilation efficiency, and supply air temperature set point, do not directly affect the outdoor airflow rate, although they may influence the energy consumption and thermal comfort of the ventilation system.
Reference:
LEED Reference Guide for Building Design and Construction v4
Minimum Indoor Air Quality Performance
Ventilation for Acceptable Indoor Air Quality - ASHRAE
Indoor environmental input parameters for design and assessment of ... - CEN
insert code

Question 207

The owner of a large multi-building property is seeking LEED certification. In determining the LEED project boundaries the LEED AP may include non-contiguous parcels of land if

Correct Answer: B
In determining the LEED project boundaries, the LEED AP may include non-contiguous parcels of land if the parcels directly support or are associated with normal building operations and are accessible to the project's occupants. This is according to the Minimum Program Requirements (MPRs) for LEED v4.1, which state that non-contiguous parcels of land may be included within the LEED project boundary if they meet these criteria1. Facilities such as parking lots, bicycle storage, shower/changing facilities, and/or on-site renewable energy that are outside of the LEED project boundary may also be included in certain prerequisites and credits if they directly serve the LEED project and are not double-counted for other LEED projects1. The other options are not valid reasons to include non-contiguous parcels of land within the LEED project boundary.
Temporary uses such as parking or staging that are owned and managed by a third party do not directly support or are associated with normal building operations of the LEED project1. Existing public preservation easements or resource protection areas that are directly adjacent to the LEED project boundary are not considered as part of the LEED project boundary, unless they are owned by the project owner or the project team has permission to use them2. Land trusts or conservation organizations for which the LEED project provides financial support are not considered as part of the LEED project boundary, unless they are located within the same EPA Level III ecoregion as the project site3.
References:
*Minimum Program Requirements (MPRs) - U.S. Green Building Council
*NC-v4.1 MPR2: Must use reasonable LEED boundaries | LEEDuser
*Site development - protect or restore habitat, p. 2
insert code

Question 208

An existing vacant office building will be completely renovated and new mechanical, electrical and plumbing systems will be installed. 20% of the building's gross floor area will be complete at the time of certification.
There will be a data center and some retail stores on the ground floor of the building at a future date. Which rating system is applicable for the building?

Correct Answer: C
This rating system is suitable for projects where the developer controls the design and construction of the entire core and shell base building, but has no control over the design and construction of the tenant fit-out.
Since the building will have a data center and retail stores in the future, but these are not the primary function of the entire building, LEED BD+C: Core & Shell is more appropriate than LEED BD+C: Data Centers or LEED BD+C: Retail.
insert code

Question 209

Which of the following Sustainable Sites credits are eligible to be used as a campus approach?

Correct Answer: D
Explanation
According to the LEED Campus Guidance, the campus approach allows projects that share a single location and site attributes to achieve separate LEED certification for each project, building space, or group on the master site. The campus approach can be used for certain credits that are influenced by the site conditions and infrastructure, such as Sustainable Sites credits. The LEED Campus Guidance provides a list of eligible credits for the campus approach, which includes the following Sustainable Sites credits1:
*Site Assessment
*Site Development - Protect or Restore Habitat
*Open Space
*Rainwater Management
*Heat Island Reduction
*Light Pollution Reduction
Therefore, Heat Island Reduction, Light Pollution Reduction, and Rainwater Management are Sustainable Sites credits that are eligible to be used as a campus approach. Places of Respite, Site Master Plan, and Direct Exterior Access are not Sustainable Sites credits, but other credits or prerequisites that are not eligible for the campus approach1.
References:
*LEED Campus Guidance1
insert code

Question 210

A tenant of a new office building will require 100 workstations per floor. Each floor will have two bathroom facilities and one conference room. How many lighting control devices with at least three lighting levels per floor are required to comply with Indoor Environmental Quality Credit, Interior Lighting, Option 1. Lighting Control?

Correct Answer: B
To comply with Indoor Environmental Quality Credit, Interior Lighting, Option 1. Lighting Control, the tenant of a new office building will require 93 lighting control devices with at least three lighting levels per floor. This is because the credit requires that at least 90% of individual occupant spaces have lighting controls that enable occupants to adjust the lighting to suit their individual tasks and preferences1. The credit also requires that all shared multioccupant spaces have lighting controls that enable adjustments that meet the needs of the group1. According to the LEED BD+C Reference Guide, an individual occupant space is defined as an enclosed space or an open space that is occupied by one person and is at least 50 square feet (4.6 square meters) in area1. A shared multioccupant space is defined as an enclosed or open space that is occupied by more than one person and is at least 100 square feet (9.3 square meters) in area1.
Based on the given information, each workstation can be considered as an individual occupant space, and each bathroom facility and conference room can be considered as a shared multioccupant space. Therefore, the number of lighting control devices per floor can be calculated as follows:
For the 100 workstations, 90% of them need lighting controls, which is 90 workstations. Each workstation needs one lighting control device, so the total number of lighting control devices for the workstations is 90.
For the two bathroom facilities, each facility needs one lighting control device, so the total number of lighting control devices for the bathroom facilities is 2.
For the one conference room, one lighting control device is needed, so the total number of lighting control devices for the conference room is 1.
The total number of lighting control devices per floor is then 90 + 2 + 1 = 93.
insert code
  • ««
  • «
  • …
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • …
  • »
  • »»
[×]

Download PDF File

Enter your email address to download USGBC.LEED-AP-BD-C.v2025-12-01.q236 Dumps

Email:

FreeQAs

Our website provides the Largest and the most Latest vendors Certification Exam materials around the world.

Using dumps we provide to Pass the Exam, we has the Valid Dumps with passing guranteed just which you need.

  • DMCA
  • About
  • Contact Us
  • Privacy Policy
  • Terms & Conditions
©2026 FreeQAs

www.freeqas.com materials do not contain actual questions and answers from Cisco's certification exams.