FreeQAs
 Request Exam  Contact
  • Home
  • View All Exams
  • New QA's
  • Upload
PRACTICE EXAMS:
  • Oracle
  • Fortinet
  • Juniper
  • Microsoft
  • Cisco
  • Citrix
  • CompTIA
  • VMware
  • ISC
  • SAP
  • EMC
  • PMI
  • HP
  • Salesforce
  • Other
  • Oracle
    Oracle
  • Fortinet
    Fortinet
  • Juniper
    Juniper
  • Microsoft
    Microsoft
  • Cisco
    Cisco
  • Citrix
    Citrix
  • CompTIA
    CompTIA
  • VMware
    VMware
  • ISC
    ISC
  • SAP
    SAP
  • EMC
    EMC
  • PMI
    PMI
  • HP
    HP
  • Salesforce
    Salesforce
  1. Home
  2. USGBC Certification
  3. LEED-AP-BD-C Exam
  4. USGBC.LEED-AP-BD-C.v2026-04-11.q171 Dumps
  • ««
  • «
  • …
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • …
  • »
  • »»
Download Now

Question 66

According to Location and Transportation Credit, Sensitive Land Protection, Option 2: Floodplains requirement, projects that do not have legally adopted flood hazard maps should locate on a site that is:

Correct Answer: A
For LEED BD+C Location and Transportation (LT) Credit: Sensitive Land Protection, Option 2, projects must be located outside of high-risk flood zones.
* LEED aligns with FEMA's 100-year floodplain definition, meaning projects must be located outside areas with a 1% or greater chance of flooding annually.
* Projects in flood-prone areas require additional mitigation measures.
* The other options (B, C, and D) use incorrect flood frequency thresholds that do not align with LEED standards.
LEED requires projects to be entirely outside a 100-year floodplain (1% annual chance of flooding).
(Source: Official LEED BD+C Reference Manual)
insert code

Question 67

A luxury hotel project is in the design phase and is located on a scenic waterfront. It is one point away from attaining LEED Platinum certification. The LEED AP is recommending that the team pursue Innovation Credit, Innovation, Option 3. Additional Strategies. Which of the following credits would be desirable considering the location of the project?

Correct Answer: B
The LEED Platinum certification requires the project to achieve exemplary performance in at least one credit that allows it, as specified in the LEED Reference Guide1. One of the credits that meets this criterion is the Indoor Environmental Quality Credit, which focuses on providing healthy and comfortable indoor environments for occupants. The credit has two options: Quality Views and Enhanced Commissioning.
Quality Views requires the project to have windows that provide views of natural scenery or water bodies, which can enhance the well-being and satisfaction of occupants. Enhanced Commissioning requires the project to have a comprehensive commissioning plan that ensures all systems are properly installed, tested, and operated before occupancy. Both options can help reduce energy consumption, improve indoor air quality, and create a positive sensory experience for occupants.
References:
* LEED Reference Guide v4
* LEED Platinum Certification - LD Products
* LEED Accreditation | LEED Certification & Credentials Overview - GBES
insert code

Question 68

A project team develops a site plan for a school project with an athletic field and a playground with real grass.
In order to qualify for the Water Efficiency Prerequisite, Outdoor Water Use Reduction, the landscape area calculations:

Correct Answer: D
For the Water Efficiency (WE) Prerequisite: Outdoor Water Use Reduction, athletic fields and playgrounds are considered special landscape areas and can be optionally included in landscape area calculations. This flexibility (D) allows teams to decide based on the unique water needs of these areas, as athletic fields often require extensive watering for maintenance. LEED recognizes these areas' high water demand and provides an exception, acknowledging the potential challenges in reducing water for such intensive-use spaces.
insert code

Question 69

A project's total site area is 240,000 ft2 (22 297 m2) and the building footprint is 40,000 ft2 (3 716 m2). How much outdoor space and vegetated space must it provide to earn Sustainable Sites Credit, Open Space?

Correct Answer: C
Explanation
According to the LEED v4 Reference Guide for Building Design and Construction, the project must provide outdoor space that is at least 30% of the total site area (including the building footprint), of which at least 25% must be vegetated. In this case, the project must provide 0.3 x 240,000 ft2 = 72,000 ft2 (6 689 m2) of outdoor space, of which 0.25 x 72,000 ft2 = 18,000 ft2 (1 672 m2) must be vegetated. Therefore, option C is the correct answer.References: LEED v4 Reference Guide for Building Design and Construction, p.5411
insert code

Question 70

Water Efficiency Prerequisite, Outdoor Water Use Reduction, Option 2. Reduced Irrigation, requires that a project's landscape water requirement be reduced by what percentage from the calculated baseline for the project site's peak watering month?

Correct Answer: C
According to the LEED v4: Building Design + Construction Guide, the Water Efficiency Prerequisite, Outdoor Water Use Reduction, Option 2. Reduced Irrigation, requires that a project's landscape water requirement be reduced by at least 30% from the calculated baseline for the project site's peak watering month. The baseline is determined by the Environmental Protection Agency (EPA) WaterSense Water Budget Tool, or a local equivalent for projects outside the U.S. The reduction must be achieved through plant species selection and irrigation system efficiency1. Reference: LEED v4: Building Design + Construction Guide, Water Efficiency Prerequisite, Outdoor Water Use Reduction, Option 2. Reduced Irrigation, Requirements1
insert code
  • ««
  • «
  • …
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • …
  • »
  • »»
[×]

Download PDF File

Enter your email address to download USGBC.LEED-AP-BD-C.v2026-04-11.q171 Dumps

Email:

FreeQAs

Our website provides the Largest and the most Latest vendors Certification Exam materials around the world.

Using dumps we provide to Pass the Exam, we has the Valid Dumps with passing guranteed just which you need.

  • DMCA
  • About
  • Contact Us
  • Privacy Policy
  • Terms & Conditions
©2026 FreeQAs

www.freeqas.com materials do not contain actual questions and answers from Cisco's certification exams.