FreeQAs
 Request Exam  Contact
  • Home
  • View All Exams
  • New QA's
  • Upload
PRACTICE EXAMS:
  • Oracle
  • Fortinet
  • Juniper
  • Microsoft
  • Cisco
  • Citrix
  • CompTIA
  • VMware
  • ISC
  • SAP
  • EMC
  • PMI
  • HP
  • Salesforce
  • Other
  • Oracle
    Oracle
  • Fortinet
    Fortinet
  • Juniper
    Juniper
  • Microsoft
    Microsoft
  • Cisco
    Cisco
  • Citrix
    Citrix
  • CompTIA
    CompTIA
  • VMware
    VMware
  • ISC
    ISC
  • SAP
    SAP
  • EMC
    EMC
  • PMI
    PMI
  • HP
    HP
  • Salesforce
    Salesforce
  1. Home
  2. USGBC Certification
  3. LEED-AP-BD-C Exam
  4. USGBC.LEED-AP-BD-C.v2026-04-11.q171 Dumps
  • ««
  • «
  • …
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • …
  • »
  • »»
Download Now

Question 101

Location and Transportation Credit, Surrounding Density and Diverse Uses, Option 1. Surrounding Density requires project teams to exclude what type of land area from the calculations?

Correct Answer: B
Explanation
This option requires the project team to exclude public right-of-way areas, such as streets, sidewalks, and alleys, from the calculations of the surrounding existing density1. This option ensures that the density is measured based on the buildable land area, which is the area available for development or construction2.
References: = [LEED v4: Building Design + Construction Guide], Surrounding density and diverse uses.
insert code

Question 102

A developer is considering an urban infill site for a new commercial building rather than a rural greenfield site adjacent to a stream. Which of the following is an economic advantage of the infill site?

Correct Answer: C
An economic advantage of the infill site is that it reduces the need for new utility infrastructure. This is because the infill site is located within an existing urban area that already has access to water, sewer, electricity, and other utilities1. The developer can save on the costs of extending or installing new utility lines and services to the rural greenfield site, which may not have adequate or reliable utility infrastructure2. The other options are not economic advantages, but rather environmental benefits of the infill site. Protecting greenfields and farmland, preserving habitat and natural resources, and reducing potential damage to an existing stream are all positive outcomes of avoiding development on the rural greenfield site, but they do not directly translate into monetary savings for the developer3.
insert code

Question 103

The use of lead, mercury, copper and cadmium should be limited because they all

Correct Answer: A
According to the LEED v4: Building Design + Construction Guide, lead, mercury, copper and cadmium are examples of persistent bioaccumulative toxins (PBTs) that should be limited in building products. PBTs are substances that remain in the environment for long periods of time, accumulate in living organisms, and pose health risks to humans and wildlife. One of the prerequisites for the Materials and Resources Credit, Building Product Disclosure and Optimization - Material Ingredients, is to reduce the use of products that contain PBTs above certain thresholds1. Reference: LEED v4: Building Design + Construction Guide, Materials and Resources Credit, Building Product Disclosure and Optimization - Material Ingredients, Option 3: Product Manufacturer Supply Chain Optimization1
insert code

Question 104

To achieve the Sustainable Sites Credit, Light Pollution Reduction, Option 1. BUG Rating Method, projects must demonstrate:

Correct Answer: D
Detailed Explanation:
Under the BUG Rating Method, all luminaires must meet acceptable fixture ratings (Backlight, Uplight, and Glare ratings) for the project's Model Lighting Ordinance (MLO) lighting zone. This ensures compliance with LEED's Light Pollution Reduction credit by limiting light trespass, reducing glare, and preserving night sky quality.
insert code

Question 105

A topographic assessment of a project site located 150 ft. (45 m) from a water body was conducted. The results of the slope analysis show that the site is generally sloping 6% to 8% to the northwest over most of the site, with some steep slopes located at the eastern edge of the property, which may impact the runoff volume.
Which one of the following LEED credits or prerequisites will be affected by these results?

Correct Answer: A
The Sustainable Sites (SS) Credit: Rainwater Management (A) would be affected by the slope analysis results. Slopes, especially those near water bodies, can significantly impact stormwater runoff volume and patterns. Managing runoff in sloped areas is crucial to minimize erosion, reduce pollutants, and protect nearby water bodies. This credit aims to reduce runoff volume and improve water quality by implementing effective rainwater management strategies based on site conditions. Other credits, like Environmental Site Assessment (B) or Sensitive Land Protection (C), don't focus on runoff management.
insert code
  • ««
  • «
  • …
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • …
  • »
  • »»
[×]

Download PDF File

Enter your email address to download USGBC.LEED-AP-BD-C.v2026-04-11.q171 Dumps

Email:

FreeQAs

Our website provides the Largest and the most Latest vendors Certification Exam materials around the world.

Using dumps we provide to Pass the Exam, we has the Valid Dumps with passing guranteed just which you need.

  • DMCA
  • About
  • Contact Us
  • Privacy Policy
  • Terms & Conditions
©2026 FreeQAs

www.freeqas.com materials do not contain actual questions and answers from Cisco's certification exams.