FreeQAs
 Request Exam  Contact
  • Home
  • View All Exams
  • New QA's
  • Upload
PRACTICE EXAMS:
  • Oracle
  • Fortinet
  • Juniper
  • Microsoft
  • Cisco
  • Citrix
  • CompTIA
  • VMware
  • ISC
  • SAP
  • EMC
  • PMI
  • HP
  • Salesforce
  • Other
  • Oracle
    Oracle
  • Fortinet
    Fortinet
  • Juniper
    Juniper
  • Microsoft
    Microsoft
  • Cisco
    Cisco
  • Citrix
    Citrix
  • CompTIA
    CompTIA
  • VMware
    VMware
  • ISC
    ISC
  • SAP
    SAP
  • EMC
    EMC
  • PMI
    PMI
  • HP
    HP
  • Salesforce
    Salesforce
  1. Home
  2. USGBC Certification
  3. LEED-AP-BD-C Exam
  4. USGBC.LEED-AP-BD-C.v2026-04-11.q171 Dumps
  • «
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • …
  • »
  • »»
Download Now

Question 11

Which of the following products must always be included in Materials and Resources credits?

Correct Answer: C
Interior paint must always be included in Materials and Resources credits. This is because interior paint is considered as a permanently installed product, which is defined by the LEED v4 Reference Guide for Building Design and Construction as "a product that is installed in a project permanently or semi-permanently, such that removal would require demolition or substantial renovation."1 Permanently installed products must be included in the calculations for the following Materials and Resources credits: Building Life-Cycle Impact Reduction, Building Product Disclosure and Optimization - Environmental Product Declarations, Building Product Disclosure and Optimization - Sourcing of Raw Materials, and Building Product Disclosure and Optimization - Material Ingredients.1 The other options are not always included in Materials and Resources credits. Faucets (option A) and fire suppression systems (option D) are considered as mechanical, electrical, and plumbing components, which are excluded from the scope of Materials and Resources credits unless they are specifically addressed by the credit requirements.1 Furniture (option B) is considered as a non-permanently installed product, which is optional to include in Materials and Resources credits, except for the Building Product Disclosure and Optimization - Material Ingredients credit, where furniture must be included if it is within the project scope.1 Reference: LEED v4 Reference Guide for Building Design and Construction, p. 5791; LEED v4 Reference Guide for Building Design and Construction, p. 5801; LEED v4 Reference Guide for Building Design and Construction, p. 5811; LEED v4 Reference Guide for Building Design and Construction, p. 5821; LEED v4 Reference Guide for Building Design and Construction, p. 5831
insert code

Question 12

What reference standard is used to determine compliance with the Energy and Atmosphere Prerequisite, Minimum Energy Performance when the whole building energy modeling option is used?

Correct Answer: C
ASHRAE 90.1-2010 is the reference standard used to determine compliance with the Energy and Atmosphere Prerequisite, Minimum Energy Performance when the whole building energy modeling option is used. This prerequisite requires demonstrating a 5% improvement in the proposed building performance rating compared to the baseline building performance rating per ASHRAE 90.1-2010, Appendix G1. The baseline building performance rating is based on a building design that meets the minimum requirements of ASHRAE 90.1-20102. Reference:
Prerequisite: Minimum energy performance | U.S. Green Building Council
Minimum Energy Performance - ASHRAE 90.1 - 2010
insert code

Question 13

While working on a 12,000 ft² (1,114.8 m²) medical building, a LEED AP asks the flooring manufacturer to submit the Environmental Product Declaration (EPD) for the flooring specified. The manufacturer doesn't have an EPD for their products, but all products meet ISO 14040/44 for Life Cycle Assessment (LCA). They ask if it would be acceptable to send the ISO 14040/44 LCA information in lieu of an EPD. How do you respond?

Correct Answer: A
Detailed Explanation:
ISO 14040/44 LCA information is not a substitute for an EPD in LEED documentation. To meet the requirements of the Building Product Disclosure and Optimization credit, an EPD must comply with specific LEED-recognized standards. If the manufacturer cannot provide an EPD, the project team should consider sourcing a comparable product from another manufacturer that has an EPD to maintain compliance.
insert code

Question 14

Showers are addressed under which prerequisites and/or credits within LEED Building Design and Construction?

Correct Answer: A
Showers are addressed under Water Efficiency (WE) Prerequisite: Indoor Water Use Reduction and Location and Transportation (LT) Credit: Bicycle Facilities. Showers in indoor water use reduction help minimize potable water consumption, while in the Bicycle Facilities credit, they support cycling commuters by providing end-of-trip facilities. The other options refer to credits or prerequisites unrelated to shower facilities.
insert code

Question 15

In the step-by-step guidance for Location and Transportation Credit, Bicycle Facilities, which of the following requirements can define a bicycle network?

Correct Answer: C
According to the LEED Reference Guide for Building Design and Construction1, the Location and Transportation Credit, Bicycle Facilities, requires the project to provide short-term and long-term bicycle storage and a functional entry or bicycle storage within 200 yards of a bicycle network. The bicycle network is defined as any one of the following:
* Off-street bicycle paths or on-street bicycle lanes that are physically marked and separated from motor traffic
* Streets designed for a target speed of 25 mph (40 km/h) or less, with traffic calming features such as curb extensions, speed humps, raised crossings, narrowed traffic lanes, median islands, tight corner radii, roundabouts, or landscaping
* Streets with a legal speed limit of 25 mph (40 km/h) or less that connect to a larger bicycle network Therefore, among the given options, only slow speed roadways can define a bicycle network, as they can provide a safer and more comfortable environment for cyclists. One-way streets, bike share, and traffic lights are not sufficient to define a bicycle network, as they do not necessarily indicate the presence of bicycle paths, lanes, or low-speed streets.
insert code
  • «
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • …
  • »
  • »»
[×]

Download PDF File

Enter your email address to download USGBC.LEED-AP-BD-C.v2026-04-11.q171 Dumps

Email:

FreeQAs

Our website provides the Largest and the most Latest vendors Certification Exam materials around the world.

Using dumps we provide to Pass the Exam, we has the Valid Dumps with passing guranteed just which you need.

  • DMCA
  • About
  • Contact Us
  • Privacy Policy
  • Terms & Conditions
©2026 FreeQAs

www.freeqas.com materials do not contain actual questions and answers from Cisco's certification exams.