FreeQAs
 Request Exam  Contact
  • Home
  • View All Exams
  • New QA's
  • Upload
PRACTICE EXAMS:
  • Oracle
  • Fortinet
  • Juniper
  • Microsoft
  • Cisco
  • Citrix
  • CompTIA
  • VMware
  • ISC
  • SAP
  • EMC
  • PMI
  • HP
  • Salesforce
  • Other
  • Oracle
    Oracle
  • Fortinet
    Fortinet
  • Juniper
    Juniper
  • Microsoft
    Microsoft
  • Cisco
    Cisco
  • Citrix
    Citrix
  • CompTIA
    CompTIA
  • VMware
    VMware
  • ISC
    ISC
  • SAP
    SAP
  • EMC
    EMC
  • PMI
    PMI
  • HP
    HP
  • Salesforce
    Salesforce
  1. Home
  2. VMware Certification
  3. 3V0-21.21 Exam
  4. VMware.3V0-21.21.v2022-03-26.q62 Dumps
  • ««
  • «
  • …
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • »
Download Now

Question 46

A new vSphere platform is being created. The platform will host virtual machines that will run management services and line-of-business applications.
What should the architect consider when designing the number and type of clusters required?

Correct Answer: D
insert code

Question 47

An architect is designing a new VMware solution for a customer that has a number of different resource profiles.
The following are the business requirements for the design:
The solution must support virtual machines with the following storage profiles:
- Write-intensive
- Backup
- Write-Once-Read-Many (WORM) archive
The solution must support migration of virtual machine disks between storage profiles.
The WORM archive data must be located at an isolated secure site.
The backup storage array must only be connected to a backup media server.
All data should be recoverable from backup.
Which design decision should the architect make to meet the business requirements?

Correct Answer: A
insert code

Question 48

Following a company merger, there are two data centers running vSphere environments. Both data centers are leveraging separate Layer 3 vMotion networks.
Which requirement must be met in order to enable vMotion migration between these locations?

Correct Answer: D
insert code

Question 49

Refer to the exhibit.

During a requirements gathering workshop, the customer shares the following about their existing ESXi host virtual networking infrastructure:
The customer confirms that:
Each ESXi host has approximately 200 virtual machines.
They want to maximize the number of concurrent virtual machine migrations.
When placing a host in maintenance mode, it takes a long time to evacuate the virtual machines.
Which two recommendations should the architect make in order to help the customer overcome their challenge? (Choose two.)

Correct Answer: C,D
insert code

Question 50

During a requirements gathering workshop, the customer's Chief Information Security Office (CISO) provides the following requirements that are pertinent to the design of a new vSphere environment:
All operating system critical patches must be installed within 24 hours of release.
All virtual machine templates must be updated every three months in line with company policy.
Which requirement classification is being gathered for the design documentation?

Correct Answer: A
This is lifecycle management function. The requirement is system critical patches, not system security patches.
insert code
  • ««
  • «
  • …
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • »
[×]

Download PDF File

Enter your email address to download VMware.3V0-21.21.v2022-03-26.q62 Dumps

Email:

FreeQAs

Our website provides the Largest and the most Latest vendors Certification Exam materials around the world.

Using dumps we provide to Pass the Exam, we has the Valid Dumps with passing guranteed just which you need.

  • DMCA
  • About
  • Contact Us
  • Privacy Policy
  • Terms & Conditions
©2026 FreeQAs

www.freeqas.com materials do not contain actual questions and answers from Cisco's certification exams.