Please click on the Project Scenario A button to review the project scenario and answer the following question.
MILO DESIGN STUDIO - SHENZHEN, CHINA - PROJECT SCENARIO A
MILO is a small, multi-disciplinary design studio with 30 employees located in Shenzhen, China. Their primary business is interior commercial fit-outs and they also offer sustainability consulting. Three of their employees have achieved their WELL AP credential.
They have recently leased one floor 21,528 ft.a (2 000 m2) in a building owned by another organization to use as their new studio office. This space includes floor to ceiling windows on all four exterior walls. While the windows are numerous, they are also highly tinted, with a visible light transmittance of approximately 0.35 (35%). They intend on installing several living plant walls and have included natural fibers and patterns in their finishings throughout.
Their building is located 984.25 ft. (300 m) from an underground train station and across the road (approx.
328.08 ft. (100 m)) from a large public park. While many employees have indicated that they bike to work on bike trails, the new building's landlord will not allow tenants to use the elevators to bring bicycles to their offices. Instead, their building has bike racks at the building entrance, an underground garage for bike storage, small rentable lockers and basic bike maintenance tools.
MILO considers itself a human-centric design firm and leads with a people-first approach through its employee benefits and organizational policies. As an example, they offer a 50% discount on several mindfulness apps and make guided meditation courses available twice per year to all employees on-site.
PROJECT SCOPE & GOALS
MILO has enrolled their office for WELL Certification to demonstrate their commitment to designing for well-being and employee health. They will be renovating and designing the entire fit-out themselves, including new space configurations that will prioritize natural light.
The space layout will include seating for 45 people in an open-plan office with hot-desking, three conference rooms and four individual phone booths. Additionally, they are planning to update lighting fixtures and purchase new office furniture. MILO do not provide any food or beverages on a daily basis except coffee and tea.
MILO is targeting WELL Certification at the Gold level or higher. This effort is being led by one of their inhouse WELL APs.
Given the facade design, referenced in the protect scenario A, which feature is most appropriate for this project?
In addition to M06: Restorative Opportunities, which feature contributes to a healthy sleep and wake rhythm?
For projects to obtain WELL Certification at the Platinum level, what is the minimum number of points that must be achieved per concept?
A developer wants to complete WELL Certification quickly for a WELL Core office building. The WELL documentation is approved for the project, the base building is complete, but the building is not yet occupied.
Which step should the project team take first to address the developer's goal?
Which option best explains the intent of hands-free flushing, hands-free soap dispensers and hands-free hand drying?