FreeQAs
 Request Exam  Contact
  • Home
  • View All Exams
  • New QA's
  • Upload
PRACTICE EXAMS:
  • Oracle
  • Fortinet
  • Juniper
  • Microsoft
  • Cisco
  • Citrix
  • CompTIA
  • VMware
  • ISC
  • SAP
  • EMC
  • PMI
  • HP
  • Salesforce
  • Other
  • Oracle
    Oracle
  • Fortinet
    Fortinet
  • Juniper
    Juniper
  • Microsoft
    Microsoft
  • Cisco
    Cisco
  • Citrix
    Citrix
  • CompTIA
    CompTIA
  • VMware
    VMware
  • ISC
    ISC
  • SAP
    SAP
  • EMC
    EMC
  • PMI
    PMI
  • HP
    HP
  • Salesforce
    Salesforce
  1. Home
  2. APICS Certification
  3. CPIM-8.0 Exam
  4. APICS.CPIM-8.0.v2026-02-13.q305 Dumps
  • ««
  • «
  • …
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • …
  • »
  • »»
Download Now

Question 116

Which of the following activities is an example of collaboration between suppliers and operations which would give more lead time visibility?

Correct Answer: B
Sharing of demand data with a supplier is an example of collaboration between suppliers and operations which would give more lead time visibility. This is because it allows the supplier to plan and adjust their production and delivery schedules according to the customer's needs, reducing the risk of stockouts or excess inventory. It also enables the supplier to provide feedback and suggestions to improve the demand planning process and the accuracy of the forecasts. Sharing of demand data is a key component of supplier relationship management (SRM) and collaborative planning, forecasting, and replenishment (CPFR). Reference := CPIM Exam Content Manual, Module 4: Supply, Section 4.2: Supplier Relationship Management, p. 15 Essentials of Supply Chain Management, Chapter 6: Demand Planning and Forecasting, Section 6.4: Collaborative Planning, Forecasting, and Replenishment, pp. 101-103
insert code

Question 117

For a company that uses first in, first out (FIFO) inventory accounting, the actual use in production of a recently arrived shipment of more expensive components rather than lower-cost components previously received will have which of the following results?

Correct Answer: A
FIFO inventory accounting assumes that the first items purchased or produced are the first ones sold or used.
Therefore, the cost of goods sold reflects the oldest costs of inventory. If a company uses a more expensive shipment of components instead of the lower-cost ones that were previously received, it will increase the cost of goods sold and reduce the gross profit margin. This is because the newer components have a higher unit cost than the older ones, and the cost of goods sold is calculated by multiplying the unit cost by the number of units sold or used. References:
*CPIM Part 1 Exam Content Manual, page 17, section 3.2.1: "Explain the impact of inventory valuation methods (for example, first in, first out [FIFO], last in, first out [LIFO], average cost, standard cost) on financial statements and taxes."
*CPIM Part 1 Study Guide, page 63, section 3.2.1: "The FIFO method assumes that the first goods purchased or produced are the first goods sold. The cost of goods sold is based on the oldest costs, and the ending inventory is based on the most recent costs. The FIFO method results in a higher net income and a higher ending inventory value in a period of rising prices."
insert code

Question 118

An organization currently has a network with 55,000 unique Internet Protocol (IP) addresses in their private Internet Protocol version 4 (IPv4) network range and has acquired another organization and must integrate their 25,000 endpoints with the existing, flat network topology.
If subnetting is not implemented, which network class is implied for the organization's resulting private network segment?

Correct Answer: A
insert code

Question 119

It takes an average of 3 hours to set up a model and 1 hour to run, but depending on the complexity of the models, the setup time can be significantly different. Last week. 2 modelers were working on different projects. Each worked 40 hours. One modeler finished 5 models a day, and the other finished 1 model a day. What was the demonstrated capacity last week?

Correct Answer: C
The demonstrated capacity last week is the total number of models completed by both modelers in 40 hours. One modeler finished 5 models a day, which means 25 models in a week. The other modeler finished 1 model a day, which means 5 models in a week. Therefore, the demonstrated capacity last week is 25 + 5 = 30 models. However, this is not one of the options given. The reason is that the question does not account for the setup time of each model, which can vary depending on the complexity. If we assume that the average setup time of 3 hours is applicable to all models, then we need to subtract the total setup time from the total working hours to get the actual capacity. The total setup time for 30 models is 30 x 3 = 90 hours. The total working hours for both modelers is 2 x 40 = 80 hours. Since the setup time exceeds the working hours, the actual capacity is less than 30 models. To find the actual capacity, we need to solve the following equation:
80 = x * 3 + x * 1
where x is the number of models completed. Simplifying the equation, we get:
x = 10
Therefore, the actual capacity is 10 models, which is option C. Reference:
Managing Supply Chain Operations, Chapter 6: Capacity Management, Section 6.1: Capacity Concepts, Subsection 6.1.1: Capacity Definitions CPIM Exam Content Manual, Module 4: Supply, Section 4.2: Capacity Management, Subsection 4.2.1: Capacity Concepts
insert code

Question 120

A startup organization has been growing rapidly and is planning to open a new office on another continent.
Until infrastructure for the new office can be built, the organization is setting up remote access to the existing network. Which of the following is the MOST important secure implementation to complete during the expansion?

Correct Answer: D
insert code
  • ««
  • «
  • …
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • …
  • »
  • »»
[×]

Download PDF File

Enter your email address to download APICS.CPIM-8.0.v2026-02-13.q305 Dumps

Email:

FreeQAs

Our website provides the Largest and the most Latest vendors Certification Exam materials around the world.

Using dumps we provide to Pass the Exam, we has the Valid Dumps with passing guranteed just which you need.

  • DMCA
  • About
  • Contact Us
  • Privacy Policy
  • Terms & Conditions
©2026 FreeQAs

www.freeqas.com materials do not contain actual questions and answers from Cisco's certification exams.