FreeQAs
 Request Exam  Contact
  • Home
  • View All Exams
  • New QA's
  • Upload
PRACTICE EXAMS:
  • Oracle
  • Fortinet
  • Juniper
  • Microsoft
  • Cisco
  • Citrix
  • CompTIA
  • VMware
  • ISC
  • SAP
  • EMC
  • PMI
  • HP
  • Salesforce
  • Other
  • Oracle
    Oracle
  • Fortinet
    Fortinet
  • Juniper
    Juniper
  • Microsoft
    Microsoft
  • Cisco
    Cisco
  • Citrix
    Citrix
  • CompTIA
    CompTIA
  • VMware
    VMware
  • ISC
    ISC
  • SAP
    SAP
  • EMC
    EMC
  • PMI
    PMI
  • HP
    HP
  • Salesforce
    Salesforce
  1. Home
  2. APICS Certification
  3. CPIM-8.0 Exam
  4. APICS.CPIM-8.0.v2026-02-13.q305 Dumps
  • ««
  • «
  • …
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • …
  • »
  • »»
Download Now

Question 151

Moving average forecasting methods are best when demand shows:

Correct Answer: B
Moving average forecasting methods are best when demand shows high random variation, as they help to smooth out the noise and capture the underlying level of demand. Moving average methods use the average of the most recent observations as the forecast for the next period. They assign equal weights to all observations in the average, and drop the oldest observation when a new one becomes available. Moving average methods are not suitable for demand patterns that show a clear trend, consistent seasonality, or a cyclical pattern, as they cannot capture these components of demand. For these patterns, more sophisticated methods such as exponential smoothing or regression are needed. References: Forecasting with moving averages, APICS CPIM
8 Planning and Inventory Management | ASCM
insert code

Question 152

The time spent In queue by a specific manufacturing job is determined by which of the following factors related to the order?

Correct Answer: B
The time spent in queue by a specific manufacturing job is determined by the priority of the order. Priority is the relative importance or urgency of an order compared to other orders in the system. Priority can be assigned based on various criteria, such as due date, customer preference, profitability, or first-come-first-served. Priority determines the order in which jobs are processed at each workstation and affects the waiting time and flow time of each job. Higher priority jobs have shorter waiting times and lower priority jobs have longer waiting times. Priority can be used as a tool to manage the trade-offs between customer service, capacity utilization, and inventory levels. Reference:
Managing Supply Chain Operations, Chapter 7: Scheduling and Sequencing, Section 7.2: Priority Rules CPIM Exam Content Manual, Module 6: Detailed Schedules, Section 6.2: Scheduling and Sequencing, Subsection 6.2.2: Priority Rules
insert code

Question 153

One of the benefits of Integrating a poka-yoke into the production process is that it can be used to:

Correct Answer: B
Poka-yoke is a Japanese term that means "mistake-proofing". It is a lean tool that aims to eliminate errors and defects by designing processes or products in such a way that mistakes are either prevented or detected and corrected immediately. Poka-yoke can be applied in various ways, such as using sensors, guides, checklists, alarms, or color-coding, to ensure that the process or product meets the quality standards and customer expectations. One of the benefits of integrating poka-yoke into the production process is that it can be used to prevent defects, which can result in lower costs, higher customer satisfaction, and improved productivity. By avoiding defects, poka-yoke can also reduce waste, rework, inspection, and warranty claims, as well as enhance safety and reliability. References := CPIM Part 2 Exam Content Manual, Version 8.0, ASCM, 2021, p. 29. CPIM Part 2 Learning System, Version 8.0, Module 3, Section C, Topic 2.
insert code

Question 154

One of the most useful tools for analyzing the sustainable footprint is:

Correct Answer: A
Process mapping is a tool that helps identify the inputs, outputs, and activities of a process, as well as the environmental impacts and opportunities for improvement. Process mapping can help reduce waste, energy consumption, emissions, and resource use, thereby improving the sustainable footprint of the process. Therefore, option A is correct. Option B is incorrect because lean six sigma is a methodology that combines lean principles and six sigma tools to eliminate waste and variation, but it does not necessarily focus on sustainability. Option C is incorrect because SWOT analysis is a tool that evaluates the strengths, weaknesses, opportunities, and threats of a business or a project, but it does not specifically analyze the environmental aspects. Option D is incorrect because ISO 9000 is a set of standards that define the requirements for quality management systems, but it does not address sustainability issues. Reference: CPIM Part 2 Exam Content Manual, Version 8.0, Section H: Quality, Continuous Improvement, and Technology, Subsection H.4: Sustainability, p. 86.
insert code

Question 155

Which of the below represents the GREATEST cloud-specific policy and organizational risk?

Correct Answer: B
insert code
  • ««
  • «
  • …
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • …
  • »
  • »»
[×]

Download PDF File

Enter your email address to download APICS.CPIM-8.0.v2026-02-13.q305 Dumps

Email:

FreeQAs

Our website provides the Largest and the most Latest vendors Certification Exam materials around the world.

Using dumps we provide to Pass the Exam, we has the Valid Dumps with passing guranteed just which you need.

  • DMCA
  • About
  • Contact Us
  • Privacy Policy
  • Terms & Conditions
©2026 FreeQAs

www.freeqas.com materials do not contain actual questions and answers from Cisco's certification exams.