FreeQAs
 Request Exam  Contact
  • Home
  • View All Exams
  • New QA's
  • Upload
PRACTICE EXAMS:
  • Oracle
  • Fortinet
  • Juniper
  • Microsoft
  • Cisco
  • Citrix
  • CompTIA
  • VMware
  • ISC
  • SAP
  • EMC
  • PMI
  • HP
  • Salesforce
  • Other
  • Oracle
    Oracle
  • Fortinet
    Fortinet
  • Juniper
    Juniper
  • Microsoft
    Microsoft
  • Cisco
    Cisco
  • Citrix
    Citrix
  • CompTIA
    CompTIA
  • VMware
    VMware
  • ISC
    ISC
  • SAP
    SAP
  • EMC
    EMC
  • PMI
    PMI
  • HP
    HP
  • Salesforce
    Salesforce
  1. Home
  2. ISTQB Certification
  3. ISTQB-CTFL Exam
  4. ISTQB.ISTQB-CTFL.v2026-04-09.q129 Dumps
  • «
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • …
  • »
  • »»
Download Now

Question 6

What is 'Component Testing'?

Correct Answer: D
Component testing is a test level. A test level is a group of test activities that are organized and managed together based on some common characteristics or objectives. A test level can be defined based on various factors, such as the scope and target of testing, the phase and model of development, the stakeholders and roles involved in testing, etc. Component testing (also known as unit testing or module testing) is a test level that focuses on verifying the functionality and quality of individual software components (such as modules, classes, functions, methods, etc.). Component testing can be performed by developers or testers using various techniques and tools depending on the type and complexity of the components. The other options are not test levels. Integration testing is another test level that focuses on verifying the functionality and quality of groups of software components that interact with each other or with external systems. Functional testing is a type of black-box dynamic testing that verifies that the system under test performs its intended functions according to its requirements or specifications. Experience-based testing is a category of test design techniques that rely on the tester's knowledge and intuition to derive and select test cases based on their experience with similar systems, technologies, domains, risks, etc. Verified References: A Study Guide to the ISTQB Foundation Level 2018 Syllabus - Springer, page 19.
insert code

Question 7

Which of the following statements about re-testing and regression testing are TRUE?
I Re-testing should be performed after a defect is fixed.
II Regression testing should always be performed after a defect is fixed.
III Re-testing and regression testing may be performed at any test level.
IV Regression testing may include functional, non-functional and structural testing.
V Re-testing should be included in the debugging activity.

Correct Answer: A
The following statements about re-testing and regression testing are true:
I) Re-testing should be performed after a defect is fixed. Re-testing is a type of testing that verifies that a defect has been successfully resolved by executing a test case that previously failed due to that defect. Re-testing should be performed after a defect is fixed and delivered to ensure that it does not cause any new failures or side effects.
III) Re-testing and regression testing may be performed at any test level. Re-testing and regression testing are not limited to a specific test level, but can be applied at any level depending on the context and objectives. For example, re-testing and regression testing can be performed at unit level, integration level, system level or acceptance level.
IV) Regression testing may include functional, non-functional and structural testing. Regression testing is a type of testing that verifies that previously tested software still performs correctly after changes. Regression testing may include various types of testing depending on the scope and purpose of the changes. For example, regression testing may include functional testing to check if the software meets its requirements, non-functional testing to check if the software meets its quality attributes, or structural testing to check if the software meets its design or code standards. The following statement about re-testing and regression testing is false:
II) Regression testing should always be performed after a defect is fixed. Regression testing is not always necessary after a defect is fixed, as some defects may have a low impact or low likelihood of affecting other parts of the software. Regression testing should be performed after a defect is fixed only if there is a risk of introducing new defects or causing existing defects due to the changes made to fix the defect. Verified Reference: A Study Guide to the ISTQB Foundation Level 2018 Syllabus - Springer, Chapter 2, page 19; Chapter 4, page 45.
insert code

Question 8

A company runs a pilot project for evaluation of a test automation tool. Which of the following is NOT a valid object of this pilot project?

Correct Answer: C
A pilot project is a small-scale experiment or trial that is conducted to evaluate the feasibility, effectiveness, and suitability of a test automation tool before implementing it on a larger scale1.
The objectives of a pilot project may vary depending on the context and scope of the test automation initiative, but some common ones are2:
To get familiar with the functionality and options of the tool
To check how the tool fits to the existing test processes and environment To assess the benefits and challenges of using the tool To decide upon standards and guidelines for tool implementation and usage To estimate the costs and resources required for tool deployment and maintenance Therefore, option C is not a valid objective of a pilot project, as it is not necessary to train all testers on using the tool at this stage. Training all testers on using the tool would be more appropriate after the tool has been selected and approved for full-scale implementation, and after the standards and guidelines have been established. Training all testers on using the tool during the pilot project would be inefficient, costly, and premature, as the tool may not be suitable or effective for the intended purpose, or may be replaced by another tool later.
Reference:
1: ISTQB Certified Tester Foundation Level Syllabus 2018, Version 4.0, p. 82
2: ISTQB Certified Tester Foundation Level Syllabus 2018, Version 4.0, p. 83
3: ISTQB Certified Tester Foundation Level Syllabus 2018, Version 4.0, p. 84
4: ISTQB Certified Tester Foundation Level Syllabus 2018, Version 4.0, p. 85
insert code

Question 9

Which of the following BEST describes a test summary report for executive-level employees

Correct Answer: C
For executive-level employees, a test summary report should be concise and focus on high-level information.
It typically includes a summary of defects categorized by priority or budget. Executives are generally interested in the overall status and the impact on critical business objectives rather than detailed technical information. The report should provide an overview of the most important aspects of testing, such as key issues, test progress, and any risks or concerns that could affect project outcomes.References:
* ISTQB Certified Tester Foundation Level Syllabus v4.0, Section 5.3.1.
insert code

Question 10

The ISTOB glossary defines Quality Assurance as: "Pail or quality management focused on providing confidence that quality requirements will be fulfilled. Which of the following Is not one of the Quality Assurance activity?

Correct Answer: C
Quality Assurance (QA) activities are focused on providing confidence that quality requirements will be fulfilled through planned and systematic processes. These activities are preventive in nature, aimed at ensuring quality is built into the product from the beginning.
Requirements elicitation (A) is part of the requirements engineering process and is concerned with gathering the needs and conditions to meet for a new or altered product.
Defect analysis (B) can be part of QA activities as it involves analyzing defects to prevent them in future development cycles.
Functional Testing (C) and Performance Testing (D) are types of dynamic testing, which are actually Quality Control activities rather than Quality Assurance. They are concerned with the identification of defects in the product, not with the processes to prevent defects.
Since the question asks for an activity that is NOT part of Quality Assurance, options A and B are incorrect because they can be part of QA activities. Between C and D, while both are dynamic testing activities, Functional Testing (C) is more directly related to verifying the functionality against specified requirements, which is more aligned with Quality Control. Therefore, C is the best answer.
insert code
  • «
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • …
  • »
  • »»
[×]

Download PDF File

Enter your email address to download ISTQB.ISTQB-CTFL.v2026-04-09.q129 Dumps

Email:

FreeQAs

Our website provides the Largest and the most Latest vendors Certification Exam materials around the world.

Using dumps we provide to Pass the Exam, we has the Valid Dumps with passing guranteed just which you need.

  • DMCA
  • About
  • Contact Us
  • Privacy Policy
  • Terms & Conditions
©2026 FreeQAs

www.freeqas.com materials do not contain actual questions and answers from Cisco's certification exams.