You are a functional consultant for Contoso Entertainment System USA (USMF).
USMF plans to categorize a new night shift in its factory.
You need to create a new cost category named NightShift for the night shift.
To complete this task, sign in to Dynamics 365 portal.
A company uses Discreet manufacturing concepts to produce cables. The company's production scheduler uses internal documents to track issues on in-process production orders.
The production scheduler must group all in-process production orders according to issues. The scheduler must be able to easily determine issues with production orders.
You need to implement a method to easily identify production orders with issues.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.


A configure-to-order company is implementing Dynamics 365 for Finance and Operations. The company is preparing to use the product configuration model functionality to develop the Bill of materials (BOM), routes and valid configuration combinations.
You need to set up the configuration models, constraints, and pricing.
In which order should you perform the actions? To answer, move all actions from the list of actions to the answer area and arrange them in the correct order.

A skateboard manufacturer uses route operations to schedule resources and estimate units per hour. All products use the sample sub assembly item and resource sanding process.
You observe an increase in the number of units a sanding belt resource can produce. The production schedule is now inaccurate due to the number of units the sanding belt line can produce.
You must make a permanent change to the number of units the resource can produce for all future orders.
You need to adjust the process quantity on the route operation.
Which three actions should you perform in sequence? To answer, move the appropriate actions form the list of actions to the answer area and arrange them in the correct order.


A company uses a make-to-stock strategy for their key production components.
The number of active Kanbans for these components must be constant.
You need to configure a new Kanban rule.
How should you set up the Kanban type and replenishment strategy? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.