You need to set up the system to calculate the overhead rates automatically for production.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.


You are a functional consultant for Contoso Entertainment System USA (USMF).
You need to schedule the Material Requirements Planning (MRP) master plan to run nightly at 03:00 (UTC-8).
To complete this task, sign in to Dynamics 365 portal.
A process manufacturing company is implementing Dynamics 365 for Finance and Operations. The company will use multiple process manufacturing functionalities including by-products.
You need to configure by-product formula allocation methods.
Which methods should you use? To answer, drag the appropriate by-product burden allocation methods to the correct scenarios. Each method may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content NOTE: Each correct selection is worth one point.

A manufacturer uses discreet orders and manually consumes raw material after reporting products as finished.
You are performing an end-of-month closing for remaining picking lists on production orders. You must not be required to consume the full amount of material on production order picking lists as a result of improved production efficiency. When the production manager verifies that no material is left to consume, there are remaining back-ordered amounts.
You need to pick the line item short and eliminate the remaining demand.
What should you do?
A company implements Dynamics 365 Finance and Operations.
You need to ensure that cost roll-ups and sales price calculations are configured for the scenario. Which options should you use? To answer, select the appropriate options in the answer area. NOTE: Each correct selection is worth one point.