A configure-to-order company is implementing Dynamics 365 for Finance and Operations. The company is preparing to use the product configuration model functionality to develop the Bill of materials (BOM), routes and valid configuration combinations.
You need to set up the configuration models, constraints, and pricing.
In which order should you perform the actions? To answer, move all actions from the list of actions to the answer area and arrange them in the correct order.


You are the quality assurance manager of a pharmaceuticals company.
One of your customers has requested to only receive batches of item B0001 that have an acid concentration between 5.5% -10.5%.
You need to set up the customer specific batch attribute to track percent acid for B0001.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

A company produces homeopathic lotions for pain relief and uses Dynamics 365 for Finance and Operations.
You have replaced the vendor of a product's active ingredient with a new vendor. The new vendor is supplying the ingredient at a higher concentration of 25 percent.
The previous vendor concentration was 15 percent. You are consistently running out of two of the complimentary ingredients.
You need to update the formula and ingredient settings to allow for better order planning.
What should you do?
You are the product manager at a distribution company. You are responsible for managing product compliance standards and reporting.
Chemical product, C00D1 can be sold in all parts of the United States except for the state of California.
You need to set up these compliance requirements for C0001.
Which four actions should be performed in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.


You maintain responsible resource calendars and production orders for a manufacturing company. All production resources use the same production calendar.
A machine in the facility is defective and must be closed for repairs for the next two days.
You need to configure the resource calendar to close the resource for production for the next two days.
What should you do?