A company is looking to use Dynamics 365 Supply Chain Management.
The company is in the process of redesigning and retooling an existing manufacturing plant to support a large long-running contract. They want to be able to forecast capacity to easily ramp up for additional products.
You need to set up the environment.
Which type of manufacturing should you implement?
A Discrete manufacturing company produces speakers. The high-end speaker model uses protective rubber strips on the edges.
Approximately five inches of rubber is consistently scrapped in the production process, regardless of production quantity. Workers manually consume the extra material on the picking list or scrap it in an inventory journal.
You need configure the system to automatically account for this scrap on the Bill of materials (BOM).
What should you do?
A manufacturer sends wiring harnesses to a vendor to be soldered to a connector. You have created the subcontracting process in the bill of materials (BOM) and route to account for the items sent to the vendor.
You create separate subcontracting purchase orders to account for the service. You attempt to add the service item to the BOM. The system generates an error.
You need to set up a new item model group for the service item.
Which three actions should you perform? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

You are the production planner for a manufacturing company.
After running operations scheduling for a production order, the following error message displays:
You need to identify the cause of the error.
Which two actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
A process manufacturing company is implementing rebates in Dynamics 365 for Finance and Operations for some of their customers on specific items.
You are the production consultant in charge of implementing the processes needed for calculating and applying the rebates for the subset of customer and items.
You need to implement the order of transactions to process the rebates.
In which order should the actions be performed? To answer, move all actions from the list of actions to the answer area and arrange them in the correct order.