FreeQAs
 Request Exam  Contact
  • Home
  • View All Exams
  • New QA's
  • Upload
PRACTICE EXAMS:
  • Oracle
  • Fortinet
  • Juniper
  • Microsoft
  • Cisco
  • Citrix
  • CompTIA
  • VMware
  • SAP
  • EMC
  • PMI
  • HP
  • Salesforce
  • Other
  • Oracle
    Oracle
  • Fortinet
    Fortinet
  • Juniper
    Juniper
  • Microsoft
    Microsoft
  • Cisco
    Cisco
  • Citrix
    Citrix
  • CompTIA
    CompTIA
  • VMware
    VMware
  • SAP
    SAP
  • EMC
    EMC
  • PMI
    PMI
  • HP
    HP
  • Salesforce
    Salesforce
  1. Home
  2. Peoplecert Certification
  3. CASM Exam
  4. Peoplecert.CASM.v2025-11-24.q15 Dumps
  • «
  • 1
  • 2
  • 3
  • 4
  • »
Download Now

Question 1

Which of the following is Scrum based on?

Correct Answer: C
Scrum is built around timeboxed iterations called Sprints, where teams work in a fixed period (typically 1-4 weeks) to deliver a potentially shippable product increment.
A . Incorrect. While Scrum incorporates some Lean principles, its foundation is timeboxing, not Lean.
B . Incorrect. Scrum and DevOps are complementary but distinct. Scrum is not based on DevOps principles.
C . Correct. Timeboxing is a core aspect of Scrum, ensuring focused delivery within a defined timeframe.
D . Incorrect. Scrum rejects sequential (Waterfall-like) processes in favor of iterative and incremental work.
Reference:
Scrum Guide 2020: Sprints and Timeboxing
insert code

Question 2

What is the term for a process that has enough value that people are willing to use it initially?

Correct Answer: B
A Minimum Viable Process (MVP) is the smallest functional version of a process that delivers enough value for initial use while allowing for iterative refinement.
A . Incorrect. "Minimum Value Process" is not a recognized term in Agile.
B . Correct. The MVP concept aligns with Agile principles, focusing on delivering value early while enabling incremental improvements.
C . Incorrect. A Beta Release applies to software products rather than processes.
D . Incorrect. A Proof of Concept demonstrates feasibility but does not necessarily deliver usable value.
Reference:
Lean Startup by Eric Ries: MVP concept.
Agile principles: Iterative delivery and customer feedback.
insert code

Question 3

Which is NOT a characteristic of Agile Process Improvement?

Correct Answer: C
Agile Process Improvement emphasizes iterative, value-driven enhancements to processes, but it avoids unnecessary bureaucracy, such as overly comprehensive documentation.
A . Correct. Agile focuses on identifying and mitigating bottlenecks or constraints to optimize workflow.
B . Correct. Regular reviews, such as retrospectives, are essential to continuous improvement.
C . Incorrect. While documentation is important, Agile prefers documentation that is "just enough" to support collaboration and delivery, avoiding overly comprehensive updates.
D . Correct. Aligning processes with Agile values ensures that improvements drive responsiveness, flexibility, and customer satisfaction.
Reference:
Agile Manifesto principle: "Working software over comprehensive documentation." Lean and Agile Process Improvement strategies in ITIL 4 and SAFe.
insert code

Question 4

Which statement describes the Definition of Done?

Correct Answer: B
The Definition of Done (DoD) is a shared understanding of what constitutes completeness for a backlog item or increment, ensuring transparency and quality.
A . Incorrect. This describes Sprint requirements, not the Definition of Done.
B . Correct. The DoD is an agreement among the team about the criteria that must be met for work to be considered done.
C . Incorrect. The Sprint Review reflects completed work but does not define the DoD.
D . Incorrect. Completing work for a Sprint doesn't necessarily mean adhering to the DoD.
Reference:
Scrum Guide 2020: Definition of Done.
insert code

Question 5

Which of the following are NOT included in a Sprint Review?

Correct Answer: C
The Sprint Review focuses on inspecting the increment and adapting the backlog, not on identifying improvement actions for the team.
A . Correct. Discussions on successes are part of the Sprint Review.
B . Correct. Challenges faced during the Sprint are addressed in the Sprint Review.
C . Incorrect. Reflection on what to do differently is a key focus of the Sprint Retrospective, not the Sprint Review.
D . Correct. Reviewing the state of the backlog is a central activity in the Sprint Review.
Reference:
Scrum Guide 2020: Sprint Review and Retrospective distinctions.
insert code
  • «
  • 1
  • 2
  • 3
  • 4
  • »
[×]

Download PDF File

Enter your email address to download Peoplecert.CASM.v2025-11-24.q15 Dumps

Email:

FreeQAs

Our website provides the Largest and the most Latest vendors Certification Exam materials around the world.

Using dumps we provide to Pass the Exam, we has the Valid Dumps with passing guranteed just which you need.

  • DMCA
  • About
  • Contact Us
  • Privacy Policy
  • Terms & Conditions
©2026 FreeQAs

www.freeqas.com materials do not contain actual questions and answers from Cisco's certification exams.