UC has a variety of systems across its technology landscape, including SF, legacy enterprise resource planning (ERP) applications and homegrown CRM tools. UC has decided that they would like to consolidate all customer, opportunity and order data into Salesforce as part of its master data management (MDM) strategy.
What are the 3 key steps that a data architect should take when merging data from multiple systems into Salesforce? Choose 3 answers:
Universal Container (UC) has accumulated data over years and has never deleted data from its Salesforce org.
UC is now exceeding the storage allocations in the org. UC is now looking for option to delete unused from the org.
Which three recommendations should a data architect make is order to reduce the number of records from the org?
Choose 3 answers
Universal Container (UC) stores 10 million rows of inventory data in a cloud database, As part of creating a connected experience in Salesforce, UC would like to this inventory data to Sales Cloud without a import. UC has asked its data architect to determine if Salesforce Connect is needed.
Which three consideration should the data architect make when evaluating the need for Salesforce Connect?
NTO has multiple systems across its enterprise landscape including salesforce, with disparate version the customer records.
In salesforce, the customer is represented by the contact object.
NTO utilizes an MDM solution with these attributes:
1. The MDM solution keeps track of customer master with a master key.
2. The master key is a map to the record ID's from each external system that customer data is stored within.
3. The MDM solution provides de-duplication features, so it acts as the single source of truth.
How should a data architect implement the storage of master key within salesforce?
DreamHouse Realty has a data model as shown in the image. The Project object has a private sharing model, and it has Roll-Up summary fields to calculate the number of resources assigned to the project, total hours for the project, and the number of work items associated to the project.
There will be a large amount of time entry records to be loaded regularly from an external system into Salesforce.
What should the Architect consider in this situation?
Enter your email address to download Salesforce.Data-Architecture-And-Management-Designer.v2022-03-01.q123 Dumps