FreeQAs
 Request Exam  Contact
  • Home
  • View All Exams
  • New QA's
  • Upload
PRACTICE EXAMS:
  • Oracle
  • Fortinet
  • Juniper
  • Microsoft
  • Cisco
  • Citrix
  • CompTIA
  • VMware
  • ISC
  • SAP
  • EMC
  • PMI
  • HP
  • Salesforce
  • Other
  • Oracle
    Oracle
  • Fortinet
    Fortinet
  • Juniper
    Juniper
  • Microsoft
    Microsoft
  • Cisco
    Cisco
  • Citrix
    Citrix
  • CompTIA
    CompTIA
  • VMware
    VMware
  • ISC
    ISC
  • SAP
    SAP
  • EMC
    EMC
  • PMI
    PMI
  • HP
    HP
  • Salesforce
    Salesforce
  1. Home
  2. USGBC Certification
  3. LEED-AP-BD-C Exam
  4. USGBC.LEED-AP-BD-C.v2025-06-23.q228 Dumps
  • ««
  • «
  • …
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • …
  • »
  • »»
Download Now

Question 116

A project's installed water fixtures do not exceed WaterSense maximum levels. Which compliance path should the LEED AP select under Water Efficiency Prerequisite, Indoor Water Use Reduction, and what type of documentation is required to demonstrate compliance with this path?

Correct Answer: D
Detailed Explanation:
For Compliance Path 1: Prescriptive Achievement, project teams must demonstrate that installed fixtures meet WaterSense requirements. This is achieved through product cutsheets that verify maximum flow rates or flush volumes. LEED uses this documentation to ensure that water-efficient fixtures are installed and operational.
insert code

Question 117

A design team is working on a hospital project. In order to meet the Energy and Atmosphere Prerequisite, Minimum Energy Performance, what option is used?

Correct Answer: A
Explanation
The Whole Building Simulation option is used to meet the Energy and Atmosphere Prerequisite, Minimum Energy Performance for a hospital project.This option involves creating a detailed computer model of the building to simulate its energy performance and identify opportunities for improvement.References: LEED AP Building Design + Construction (LEED AP BD+C) V4 resources1
insert code

Question 118

Which views would qualify as a quality view for Indoor Environmental Quality Credit, Quality Views?

Correct Answer: C
Quality views are defined in LEED as those which consist of multiple elements of nature, weather, or movement that allow for a connection beyond the interior space. Views that allow a clear line of sight to the exterior via vision glazing, with a view factor of 3 or greater, qualify for this credit. Fixed glazing in common spaces can also contribute to this credit.
insert code

Question 119

Which of the following cannot be classified as graywater?

Correct Answer: A
This option requires the project to classify water from toilets as blackwater, not graywater, because it contains human waste and pathogens that pose a health risk1. Graywater is defined as wastewater that contains fewer contaminants than blackwater, such as water from showers, sinks, and washing machines2. Graywater can be reused for non-potable purposes, such as irrigation and toilet flushing, after appropriate treatment3.
References: = LEED v4: Building Design + Construction Guide, Greywater Systems, Recycled content.
insert code

Question 120

The design team has specified products to achieve Materials and Resources Credit: Building Product Disclosure and Optimization - Sourcing of Raw Materials, Option 2. Leadership Extraction Practices for the project. At the end of the construction, it was discovered that the transporter who shipped a portion of the wood did not have chain-of-custody (CoC) certification. The design team should do which of the following?

Correct Answer: B
If a transporter lacks chain-of-custody (CoC) certification for certified wood products, the design team should recalculate the percentage of certified wood and classify the affected wood as non-certified (B).
This approach follows LEED's requirements for accurate reporting on certified materials. LEED requires all certified wood to maintain CoC certification from the forest to the project site, so any deviation affects credit calculations. Submitting a CIR (A) isn't needed as the LEED rules are clear on this matter, and removal (D) may not be feasible or cost-effective.
insert code
  • ««
  • «
  • …
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • …
  • »
  • »»
[×]

Download PDF File

Enter your email address to download USGBC.LEED-AP-BD-C.v2025-06-23.q228 Dumps

Email:

FreeQAs

Our website provides the Largest and the most Latest vendors Certification Exam materials around the world.

Using dumps we provide to Pass the Exam, we has the Valid Dumps with passing guranteed just which you need.

  • DMCA
  • About
  • Contact Us
  • Privacy Policy
  • Terms & Conditions
©2026 FreeQAs

www.freeqas.com materials do not contain actual questions and answers from Cisco's certification exams.