FreeQAs
 Request Exam  Contact
  • Home
  • View All Exams
  • New QA's
  • Upload
PRACTICE EXAMS:
  • Oracle
  • Fortinet
  • Juniper
  • Microsoft
  • Cisco
  • Citrix
  • CompTIA
  • VMware
  • ISC
  • SAP
  • EMC
  • PMI
  • HP
  • Salesforce
  • Other
  • Oracle
    Oracle
  • Fortinet
    Fortinet
  • Juniper
    Juniper
  • Microsoft
    Microsoft
  • Cisco
    Cisco
  • Citrix
    Citrix
  • CompTIA
    CompTIA
  • VMware
    VMware
  • ISC
    ISC
  • SAP
    SAP
  • EMC
    EMC
  • PMI
    PMI
  • HP
    HP
  • Salesforce
    Salesforce
  1. Home
  2. USGBC Certification
  3. LEED-AP-BD-C Exam
  4. USGBC.LEED-AP-BD-C.v2025-06-23.q228 Dumps
  • ««
  • «
  • …
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • …
  • »
  • »»
Download Now

Question 136

Which of the following standards needs to be followed to comply with Indoor Environmental Quality Credit, Thermal Comfort?

Correct Answer: A
Explanation
To comply with Indoor Environmental Quality Credit, Thermal Comfort, the standard that needs to be followed is ASHRAE 55-2010, Thermal Environmental Conditions for Human Occupancy, with errata or a local equivalent1.This standard specifies the combinations of indoor thermal environmental factors and personal factors that will produce thermal environmental conditions acceptable to a majority of the occupants within the space2.The standard also provides methods for measuring and evaluating thermal comfort, as well as guidance for design, operation, and maintenance of thermal comfort systems2.References:Thermal comfort;ASHRAE 55-2010
insert code

Question 137

Which of the following statements is correct when defining the project boundary?

Correct Answer: C
Explanation
The land associated with the project supports typical operations
According to the LEED v4 Reference Guide for Building Design and Construction, the LEED project boundary must include all contiguous land that is associated with the project and supports its typical operations. This includes land altered as a result of construction and features used primarily by the project's occupants, such as hardscape (parking and sidewalks), septic or stormwater treatment equipment, and landscaping1. Therefore, statement C is correct when defining the project boundary. Statement A is incorrect because the LEED project boundary must be contiguous. Statement B is incorrect because the LEED project boundary can include more than one building, as long as they are on the same site and share a common scope of work. Statement D is incorrect because there is no such requirement for the gross floor area of the LEED project to be a certain percentage of the gross land area within the LEED project boundary.
References:
Reference Guide for Building Design and Construction v4 - Page 282
NC-v4.1 MPR2: Must use reasonable LEED boundaries | LEEDuser1
insert code

Question 138

A mixed-use development is located 1/2 mi. (0.80 km) from a future commuter rail line station. Which of the following pieces of information is needed when determining whether the rail line station can contribute to Location and Transportation Credit, Access to Quality Transit?

Correct Answer: B
The rail line station construction completion date is needed when determining whether the rail line station can contribute to Location and Transportation Credit, Access to Quality Transit. This is because the credit requires that the transit service must be existing or planned to be in operation within two years of the project's occupancy1. Discounted rail pass availability, connections to transfer routes, and passenger capacity are not relevant for this credit1.
References:
*Access to quality transit, p. 1
insert code

Question 139

What is the first step to earn the Water Efficiency Credit, Cooling Tower Water Use?

Correct Answer: D
The first step in earning the Water Efficiency (WE) Credit: Cooling Tower Water Use is to identify the maximum number of cycles of concentration for the cooling tower or evaporative condenser. This step establishes a baseline for water quality and helps determine potential water savings through maximizing the number of cycles, which minimizes water and chemical usage in cooling systems. Subsequent steps may involve chemical analysis (D) or exploring alternative water sources, but setting the cycles is the initial requirement.
insert code

Question 140

Which principal areas must the LEED AP focus on to attain the Integrative Process Credit, Integrative Process?

Correct Answer: D
The Integrative Process credit, Integrative Process, requires the project team to conduct a preliminary analysis of the energy and water related systems during the pre-design phase, and use the results to inform the design and construction of the project. The analysis must include at least two potential strategies for each of the following areas: site conditions, massing and orientation, basic envelope attributes, lighting levels, thermal comfort ranges, plug and process load needs, programmatic and operational parameters, outdoor water use, and indoor water use. The project team must also document how the analysis informed the owner's project requirements, basis of design, and design documents.
References:
* LEED v4 Reference Guide for Building Design and Construction, Integrative Process Credit:
Integrative Process, page 811
* Integrative Process Worksheet2
insert code
  • ««
  • «
  • …
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • …
  • »
  • »»
[×]

Download PDF File

Enter your email address to download USGBC.LEED-AP-BD-C.v2025-06-23.q228 Dumps

Email:

FreeQAs

Our website provides the Largest and the most Latest vendors Certification Exam materials around the world.

Using dumps we provide to Pass the Exam, we has the Valid Dumps with passing guranteed just which you need.