FreeQAs
 Request Exam  Contact
  • Home
  • View All Exams
  • New QA's
  • Upload
PRACTICE EXAMS:
  • Oracle
  • Fortinet
  • IBM
  • Juniper
  • Microsoft
  • Cisco
  • Citrix
  • CompTIA
  • VMware
  • ISC
  • SAP
  • EMC
  • PMI
  • HP
  • Salesforce
  • Other
  • Oracle
    Oracle
  • Fortinet
    Fortinet
  • IBM
    IBM
  • Juniper
    Juniper
  • Microsoft
    Microsoft
  • Cisco
    Cisco
  • Citrix
    Citrix
  • CompTIA
    CompTIA
  • VMware
    VMware
  • ISC
    ISC
  • SAP
    SAP
  • EMC
    EMC
  • PMI
    PMI
  • HP
    HP
  • Salesforce
    Salesforce
  1. Home
  2. USGBC Certification
  3. LEED-AP-BD-C Exam
  4. USGBC.LEED-AP-BD-C.v2025-06-23.q228 Dumps
  • «
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • …
  • »
  • »»
Download Now

Question 11

Which of the following credit categories identifies environmental issues that are most relevant for a project's chapter area or country?

Correct Answer: D
Detailed Explanation:
Regional Priority credits address environmental issues specific to a project's geographic location. These credits encourage project teams to focus on local priorities, such as water conservation in arid regions or stormwater management in flood-prone areas, making sustainability efforts more context-sensitive.
insert code

Question 12

For an emergency care facility project, which of the following credits can be achieved if the total cost of permanently installed products are 25% cradle-to-cradle V3 Gold and 25% GreenScreen List Translator?

Correct Answer: C
Explanation
The Materials and Resources Credit, Building Product Disclosure and Optimization, Material Ingredients, Option 2. Material Ingredient Optimization & Innovation Credit, Innovation, Exemplary Performance can be achieved if the total cost of permanently installed products are 25% cradle-to-cradle V3 Gold and 25% GreenScreen List Translator.This is because these certifications indicate that the materials used in the project have been assessed for their environmental and health impacts, contributing to the achievement of these credits.References: LEED AP Building Design + Construction (LEED AP BD+C) V4 resources1
insert code

Question 13

A new five-story building with a 30,000 ft2 (2 800 m2) footprint is being designed on a previously disturbed100,000 ft2 (9 290 m2) site. The remaining on-grade surface will be 35,000 ft2 (3 250 m2) of asphalt parking, and 35,000 ft2 (3 250 m2) of native vegetated open space. To achieve a point for exemplary performance under Option 1 of Sustainable Sites Credit, Site Development - Protect or Restore Habitat, the design team will have to incorporate a native and/or adapted vegetated roofwith a minimum area of

Correct Answer: C
Explanation
According to the LEED v4 Reference Guide for Building Design and Construction, Option 1 of the Site Development - Protect or Restore Habitat credit requires restoring 25% of the site area (including the building footprint) with native or adapted vegetation1.To achieve exemplary performance, the project must double the credit requirements and restore 50% of the site area2. In this case, the site area is 100,000 ft2 (9 290 m2), so the project must restore 50,000 ft2 (4 645 m2) with vegetation. The project already has 35,000 ft2 (3 250 m2) of native vegetated open space, so it needs to add another 15,000 ft2 (1 395 m2) of vegetation. Since the on-grade surface is fully occupied by the building footprint and the asphalt parking, the only option is to incorporate a vegetated roof.Therefore, the design team will have to incorporate a native and/or adapted vegetated roof with a minimum area of 15,000 ft2 (1 395 m2).References: SS Credit Site Development - Protect or Restore Habitat, LEED v4 Reference Guide for Building Design and Construction13
insert code

Question 14

The project team wants to modify the design of an office building copy room to minimize the risk of airborne contamination to the surrounding space. The design includes a separate exhaust, but due to design constraints the partition walls of the room cannot run deck-to-deck. What can the team do to achieve Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies?

Correct Answer: B
The Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies aims to establish better quality indoor air for the building occupants that promotes their comfort and well-being1. This credit requires the project team to implement several strategies to reduce the exposure of occupants and HVAC systems to environmental tobacco smoke, airborne contaminants, and chemicals1. One of the strategies is to design and construct all interior partitions to full height (deck-to-deck) or provide a hard-lid ceiling for spaces where hazardous gases or chemicals may be present or used2. This strategy helps prevent the migration of contaminants from one space to another through the plenum3. A copy room is an example of such a space, as it may contain printers, copiers, toners, and solvents that can emit volatile organic compounds (VOCs) and particulate matter (PM) into the air4. Therefore, the project team can achieve Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies by providing a hard-lid ceiling for the copy room.
Reference:
Enhanced Indoor Air Quality Strategies
Enhanced Indoor Air Quality Strategies - Canada Green Building Council
[LEED Reference Guide for Building Design and Construction v4], page 631 Copy Rooms: A Source of Indoor Air Pollution
insert code

Question 15

In Sustainable Sites Credit, Light Pollution Reduction, which factor is included in the lamp lumen uplight calculation?

Correct Answer: D
Explanation
This factor is included in the lamp lumen uplight calculation, because it represents the amount of light that is emitted downward by the fixture, which does not contribute to light pollution1. The lamp lumen uplight calculation is used to determine the percentage of total luminaire lumens emitted above horizontal, which must not exceed the maximum allowed values for each lighting zone2.
References: = [LEED v4: Building Design + Construction Guide], SSc6 step by step instructions - BuildingGreen.
insert code
  • «
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • …
  • »
  • »»
[×]

Download PDF File

Enter your email address to download USGBC.LEED-AP-BD-C.v2025-06-23.q228 Dumps

Email:

FreeQAs

Our website provides the Largest and the most Latest vendors Certification Exam materials around the world.

Using dumps we provide to Pass the Exam, we has the Valid Dumps with passing guranteed just which you need.

  • DMCA
  • About
  • Contact Us
  • Privacy Policy
  • Terms & Conditions
©2026 FreeQAs

www.freeqas.com materials do not contain actual questions and answers from Cisco's certification exams.