FreeQAs
 Request Exam  Contact
  • Home
  • View All Exams
  • New QA's
  • Upload
PRACTICE EXAMS:
  • Oracle
  • Fortinet
  • IBM
  • Juniper
  • Microsoft
  • Cisco
  • Citrix
  • CompTIA
  • VMware
  • ISC
  • SAP
  • EMC
  • PMI
  • HP
  • Salesforce
  • Other
  • Oracle
    Oracle
  • Fortinet
    Fortinet
  • IBM
    IBM
  • Juniper
    Juniper
  • Microsoft
    Microsoft
  • Cisco
    Cisco
  • Citrix
    Citrix
  • CompTIA
    CompTIA
  • VMware
    VMware
  • ISC
    ISC
  • SAP
    SAP
  • EMC
    EMC
  • PMI
    PMI
  • HP
    HP
  • Salesforce
    Salesforce
  1. Home
  2. USGBC Certification
  3. LEED-AP-BD-C Exam
  4. USGBC.LEED-AP-BD-C.v2025-06-23.q228 Dumps
  • ««
  • «
  • …
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • …
  • »
  • »»
Download Now

Question 26

For Energy and Atmosphere Credit, Advanced Energy Metering, what is the minimum amount of time that the metering system should store data?

Correct Answer: D
Explanation
For Energy and Atmosphere Credit, Advanced Energy Metering, the minimum amount of time that the metering system should store data is 36 months. This is to ensure that the data can be used for long-term analysis and verification of energy performance1. The credit also requires that the metering system be capable of transmitting data to a remote location and reporting energy use at least hourly1. References: Advanced energy metering
insert code

Question 27

What requirements are needed to earn Regional Priority credits?

Correct Answer: D
Regional Priority (RP) credits are awarded based on local environmental concerns.
* Projects must register for credits that align with local sustainability priorities.
* Points are NOT automatic-projects must achieve the related credits.
(Source: Official LEED BD+C Reference Manual)
insert code

Question 28

Which rating system is being used if all of the credits below have been submitted towards certification?
- Location and Transportation Credit, Reduced Parking Footprint
- Energy and Atmosphere Credit, Fundamental Refrigerant Management
- Indoor Environmental Quality Credit, Acoustic Performance
- Materials and Resources Credit, Persistent, Bio accumulative, and Toxic (PBT) Source Reduction - Lead,Cadmium, and Copper

Correct Answer: C
Explanation
The rating system that is being used if all of the credits below have been submitted towards certification is Building Design and Construction: Hospitality. This is because the Location and Transportation Credit, Reduced Parking Footprint and the Indoor Environmental Quality Credit, Acoustic Performance are only available for the Hospitality rating system among the four options. The other two credits are common for all the rating systems.References: LEED v4: Building Design + Construction Guide, p.301; LEED v4: Building Design + Construction Guide, p.401; LEED v4: Building Design + Construction Guide, p.411; LEED v4:
Building Design + Construction Guide, p.421
insert code

Question 29

A building owner installs a building automation system (BAS) to allow programmable load control. Which of the following credits can be pursued because of the installation?

Correct Answer: A
This is because:
A building automation system (BAS) is a system that controls and monitors various aspects of a building's operation, such as lighting, heating, ventilation, air conditioning, security, fire alarm, and energy management1.
A BAS can allow programmable load control (PLC), which is the ability to adjust the power consumption of devices or equipment based on a schedule, a sensor, or an event2. PLC can help reduce the energy demand and cost of a building by optimizing the use of resources and avoiding unnecessary or wasteful consumption3.
The LEED AP BD+C V4 credit for Demand Response requires that buildings have a demand response program that can respond to changes in electricity prices or supply by reducing or shifting the demand for electricity4. A BAS can enable such a program by allowing PLC and other features that can modulate the power usage of devices or equipment in response to market signals or internal conditions.
Therefore, installing a BAS to allow PLC can help achieve the Energy and Atmosphere Credit for Demand Response by reducing the energy demand and cost of a building.
insert code

Question 30

A design team is working on a hospital project. In order to meet the Energy and Atmosphere Prerequisite, Minimum Energy Performance, what option is used?

Correct Answer: A
The Whole Building Simulation option is used to meet the Energy and Atmosphere Prerequisite, Minimum Energy Performance for a hospital project. This option involves creating a detailed computer model of the building to simulate its energy performance and identify opportunities for improvement.
insert code
  • ««
  • «
  • …
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • …
  • »
  • »»
[×]

Download PDF File

Enter your email address to download USGBC.LEED-AP-BD-C.v2025-06-23.q228 Dumps

Email:

FreeQAs

Our website provides the Largest and the most Latest vendors Certification Exam materials around the world.

Using dumps we provide to Pass the Exam, we has the Valid Dumps with passing guranteed just which you need.

  • DMCA
  • About
  • Contact Us
  • Privacy Policy
  • Terms & Conditions
©2026 FreeQAs

www.freeqas.com materials do not contain actual questions and answers from Cisco's certification exams.