FreeQAs
 Request Exam  Contact
  • Home
  • View All Exams
  • New QA's
  • Upload
PRACTICE EXAMS:
  • Oracle
  • Fortinet
  • Juniper
  • Microsoft
  • Cisco
  • Citrix
  • CompTIA
  • VMware
  • ISC
  • SAP
  • EMC
  • PMI
  • HP
  • Salesforce
  • Other
  • Oracle
    Oracle
  • Fortinet
    Fortinet
  • Juniper
    Juniper
  • Microsoft
    Microsoft
  • Cisco
    Cisco
  • Citrix
    Citrix
  • CompTIA
    CompTIA
  • VMware
    VMware
  • ISC
    ISC
  • SAP
    SAP
  • EMC
    EMC
  • PMI
    PMI
  • HP
    HP
  • Salesforce
    Salesforce
  1. Home
  2. USGBC Certification
  3. LEED-AP-O-M Exam
  4. USGBC.LEED-AP-O-M.v2024-05-08.q83 Dumps
  • ««
  • «
  • …
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • …
  • »
  • »»
Download Now

Question 51

What is the maximum length of time allowed for a gap in performance monitoring before needing to restart the performance period?

Correct Answer: B
In LEED, for maintaining continuous performance monitoring, the maximum length of time allowed for a gap before needing to restart the performance period is two full weeks. This requirement ensures that performance data is consistent and reliable, providing an accurate representation of the building's operational performance.
insert code

Question 52

Which of the following best meets requirements of Sustainable Sites Credit, Site Development - Protect or Restore Habitat?

Correct Answer: C
To meet the requirements of the Sustainable Sites Credit, Site Development - Protect or Restore Habitat, a project can protect an offsite area of land that is equal in size to the building site area. This strategy is aimed at compensating for the potential habitat loss and ecological impact caused by the development of the building site. By protecting an equivalent offsite area, the project contributes to the conservation of biodiversity and supports ecological health beyond its immediate location.
References:
* LEED AP O+M Exam Guide, page 63
* Site Development - Protect or Restore Habitat, USGBC
* Site Development - Protect or Restore Habitat, LEEDuser
insert code

Question 53

How long should a commercial kitchen prep sink be metered to establish a baseline when pursuing the Water Efficiency Prerequisite, Indoor Water Use Reduction, Option 2?

Correct Answer: A
According to the LEED AP O+M Reference Guide, Option 2 of the Water Efficiency Prerequisite, Indoor Water Use Reduction, requires metering all indoor water fixtures and fittings for a minimum of six months to establish a baseline. This includes commercial kitchen prep sinks, which are considered process water fixtures.
References: LEED AP O+M Reference Guide, v4.1, p. 51-52.
insert code

Question 54

In densely populated rooms, CO2 monitors must be located a minimum of how many feet (meters) above the floor?

Correct Answer: C
In densely populated rooms, CO2 monitors must be located a minimum of 4 feet (1.2 meters) above the floor.
This is to ensure that the monitors are able to accurately measurethe CO2 levels in the breathing zone of the occupants, which can help in maintaining good indoor air quality.
References: LEED v4: Building Operations + Maintenance Guide, LEED certification for existing buildings and spaces.
In rooms that are densely populated, CO2 monitors must be located a minimum of 4 feet (1.2 meters) above the floor. This placement ensures that the monitors can accurately measure the concentration of CO2 in the breathing zone of the occupants, providing reliable data that can be used to assess and control indoor air quality. Proper placement of CO2 monitors is critical for effective ventilation and for maintaining a healthy indoor environment, especially in areas with high occupancy where CO2 levels can rise quickly and impact comfort and well-being.
insert code

Question 55

The measures called out on the following site plan may contribute to the achievement of which LEED credits?
(Click on Exhibit)
Exhibit

Correct Answer: A
insert code
  • ««
  • «
  • …
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • …
  • »
  • »»
[×]

Download PDF File

Enter your email address to download USGBC.LEED-AP-O-M.v2024-05-08.q83 Dumps

Email:

FreeQAs

Our website provides the Largest and the most Latest vendors Certification Exam materials around the world.

Using dumps we provide to Pass the Exam, we has the Valid Dumps with passing guranteed just which you need.

  • DMCA
  • About
  • Contact Us
  • Privacy Policy
  • Terms & Conditions
©2026 FreeQAs

www.freeqas.com materials do not contain actual questions and answers from Cisco's certification exams.