FreeQAs
 Request Exam  Contact
  • Home
  • View All Exams
  • New QA's
  • Upload
PRACTICE EXAMS:
  • Oracle
  • Fortinet
  • IBM
  • Juniper
  • Microsoft
  • Cisco
  • Citrix
  • CompTIA
  • VMware
  • ISC
  • SAP
  • EMC
  • PMI
  • HP
  • Salesforce
  • Other
  • Oracle
    Oracle
  • Fortinet
    Fortinet
  • IBM
    IBM
  • Juniper
    Juniper
  • Microsoft
    Microsoft
  • Cisco
    Cisco
  • Citrix
    Citrix
  • CompTIA
    CompTIA
  • VMware
    VMware
  • ISC
    ISC
  • SAP
    SAP
  • EMC
    EMC
  • PMI
    PMI
  • HP
    HP
  • Salesforce
    Salesforce
  1. Home
  2. USGBC Certification
  3. LEED-Green-Associate Exam
  4. USGBC.LEED-Green-Associate.v2024-07-12.q147 Dumps
  • ««
  • «
  • …
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • …
  • »
  • »»
Download Now

Question 121

Which of the following strategies help improve daylighting in an office building?

Correct Answer: C
Daylighting is a strategy that uses natural light to illuminate the interior spaces of a building, reducing the need for artificial lighting and improving the visual comfort and well-being of the occupants. One of the strategies that can help improve daylighting in an office building is to locate private offices toward the building core and organize cubicles at the perimeter, so that more people can benefit from the access to windows and views. This can also increase the daylight penetration depth and reduce glare and contrast12. Reference: LEED v4 Green Associate Candidate Handbook1, LEED v4 BD+C Reference Guide2
insert code

Question 122

Which of the following Is the recommended tool for the project team to utilize In order to determine the target certification level?

Correct Answer: A
Explanation
The scorecard is the recommended tool for the project team to utilize in order to determine the target certification level. The scorecard is a document that lists all the prerequisites and credits available for a specific rating system, along with their point values and requirements. The project team can use the scorecard to track their progress and estimate their potential score based on their design strategies and performance goals. The scorecard also helps the project team to identify synergies and trade-offs among different credits, prioritize their efforts, and optimize their resources.
The other options are not useful for estimating the certification level, as they are tools for documenting or clarifying specific credits or issues. The credit submittal form is a template that guides the project team on how to submit the required documentation for each credit. The project CIR (Credit Interpretation Request) is a service that allows the project team to ask technical questions or request clarifications on credit requirements or standards from USGBC or GBCI reviewers. The certification level cannot be determined without complete drawings, as they are necessary to demonstrate compliance with credit criteria.
References: LEED v4 User Guide, p. 12 2; LEED v4 Reference Guide for Building Design and Construction, p. 21 1
insert code

Question 123

Which strategy is an example of permanent entryway systems used to reduce dust, dirt and contaminants brought into a facility?

Correct Answer: D
Explanation
Permanent entryway systems are designed to capture dirt and particulates entering the building at regularly used exterior entrances. They can be grilles, grates, mats or other materials that are at least 10 feet long in the primary direction of travel12. They can improve indoor air quality, reduce maintenance costs and enhance floor appearance3.
References :=
Entryway Systems | LEEDuser
lengths of the permanent entryway systems | LEEDuser
SC LEE Credit Contributions - CS Group
insert code

Question 124

A building owner is considering developing an undeveloped urban site. What characteristic of the location is most relevant to LEED?

Correct Answer: A
Explanation
Access to quality transit is one of the criteria for the LEED v4 Location and Transportation category, which aims to reduce the environmental and human health impacts of transportation and promote sustainable site selection. By developing an urban site that is well-served by public transportation, the building owner can reduce the reliance on private vehicles, lower greenhouse gas emissions, and encourage alternative modes of travel123.
References:
LEED v4: Building Design + Construction Guide1, page 25
LEED v4 Credit Tutorials: Location & Transportation (BD+C/ID+C)2
LEED v4 Q+A: Location and Transportation3
insert code

Question 125

Which of the following Is a strategy for improving Indoor Environmental Quality during construction?

Correct Answer: A
Covering duct work with plastic is a strategy for improving indoor environmental quality during construction. Covering duct work with plastic prevents dust, debris, and contaminants from entering the ducts and affecting the air quality of the building. This also reduces the need for cleaning and maintenance of the ducts after construction. The LEED Green Associate Candidate Handbook states that one of the strategies for achieving indoor environmental quality is to "protect ducts during construction by sealing or covering with plastic" [1, p. 16]. Reference: LEED Green Associate Candidate Handbook, [Indoor Air Quality During Construction | U.S. Environmental Protection Agency]
insert code
  • ««
  • «
  • …
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • …
  • »
  • »»
[×]

Download PDF File

Enter your email address to download USGBC.LEED-Green-Associate.v2024-07-12.q147 Dumps

Email:

FreeQAs

Our website provides the Largest and the most Latest vendors Certification Exam materials around the world.

Using dumps we provide to Pass the Exam, we has the Valid Dumps with passing guranteed just which you need.

  • DMCA
  • About
  • Contact Us
  • Privacy Policy
  • Terms & Conditions
©2026 FreeQAs

www.freeqas.com materials do not contain actual questions and answers from Cisco's certification exams.