FreeQAs
 Request Exam  Contact
  • Home
  • View All Exams
  • New QA's
  • Upload
PRACTICE EXAMS:
  • Oracle
  • Fortinet
  • IBM
  • Juniper
  • Microsoft
  • Cisco
  • Citrix
  • CompTIA
  • VMware
  • ISC
  • SAP
  • EMC
  • PMI
  • HP
  • Salesforce
  • Other
  • Oracle
    Oracle
  • Fortinet
    Fortinet
  • IBM
    IBM
  • Juniper
    Juniper
  • Microsoft
    Microsoft
  • Cisco
    Cisco
  • Citrix
    Citrix
  • CompTIA
    CompTIA
  • VMware
    VMware
  • ISC
    ISC
  • SAP
    SAP
  • EMC
    EMC
  • PMI
    PMI
  • HP
    HP
  • Salesforce
    Salesforce
  1. Home
  2. USGBC Certification
  3. LEED-Green-Associate Exam
  4. USGBC.LEED-Green-Associate.v2024-07-12.q147 Dumps
  • ««
  • «
  • …
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • »
Download Now

Question 126

What organization reviews and provides final LEED certification report to projects?

Correct Answer: C
The Green Business Certification Inc. (GBCI) reviews and provides the final LEED certification report to projects. GBCI was established in 2008 as a separately incorporated entity with the support of the U.S. Green Building Council (USGBC). GBCI administers project certifications for LEED and other green business certification programs. Reference: LEED Green Associate Candidate Handbook, U.S. Green Building Council resources
insert code

Question 127

Which of the following narratives explains the relationship between prerequisites and credits for purposes of LEED certification?

Correct Answer: B
Explanation
Prerequisites and credits are the two types of requirements that make up the LEED rating system. Prerequisites are the basic elements or strategies that must be included in any LEED certified project, regardless of the rating system or the level of certification1. Credits are the additional elements or strategies that can be included in a LEED project to achieve higher levels of performance and certification1. Credits are optional and have different point values depending on their environmental benefits and impacts2. Therefore, the correct answer is B. Prerequisites are mandatory and credits are optional.
References:
LEED v4 | U.S. Green Building Council
LEED credit library | U.S. Green Building Council
insert code

Question 128

Which of the following is a strategy that a design team should consider In order to decrease the Impact of a new construction project?

Correct Answer: B
Explanation
Selecting native plants to provide habitat for local fauna is a strategy that a design team should consider in order to decrease the impact of a new construction project. Native plants are plants that have evolved in a specific region and have adapted to the local climate and soil conditions. Native plants can offer many benefits for the environment, such as:
Reducing water use and runoff by requiring less irrigation and fertilization Enhancing biodiversity and ecosystem services by supporting native wildlife and pollinators Improving air quality and mitigating climate change by sequestering carbon and reducing greenhouse gas emissions Increasing soil health and stability by preventing erosion and improving infiltration Creating a sense of place and cultural identity by reflecting the natural heritage of the region The other options are not strategies that would decrease the impact of a new construction project. Maximizing views of the existing wetland may improve occupant satisfaction, but it does not necessarily reduce the environmental footprint of the project. Locating the project in an existing office park with ample parking may reduce land use and transportation impacts, but it may also increase heat island effect and stormwater runoff.
Increasing the project's footprint to maximize roof space for a solar array may increase renewable energy generation, but it may also increase site disturbance, material use, and energy demand. References: : Native Plants
insert code

Question 129

The Interior space of a six-story commercial building is being completely renovated. Which of the following actions should the design team conduct first in order to incorporate green building strategies?

Correct Answer: A
Explanation
Setting project goals is the action that the design team should conduct first in order to incorporate green building strategies in a six-story commercial building renovation project. Setting project goals is an important step in the integrative process that defines the vision and expectations for the project's sustainability performance and guides the decision-making throughout the design and construction phases. Setting project goals involves engaging key stakeholders, such as owners, users, designers, contractors, and operators, and identifying measurable objectives, targets, and metrics for various aspects of green building, such as energy efficiency, water conservation, material selection, indoor environmental quality, site selection, and transportation access. The LEED Green Associate Candidate Handbook states that one of the steps in the integrative process is to "establish sustainability goals early in project development" [1, p.
12]. References: LEED Green Associate Candidate Handbook, [Integrative Process | U.S. Green Building Council]
insert code

Question 130

Which of the following project characteristics demonstrate smart growth principles?

Correct Answer: B
insert code
  • ««
  • «
  • …
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • »
[×]

Download PDF File

Enter your email address to download USGBC.LEED-Green-Associate.v2024-07-12.q147 Dumps

Email:

FreeQAs

Our website provides the Largest and the most Latest vendors Certification Exam materials around the world.

Using dumps we provide to Pass the Exam, we has the Valid Dumps with passing guranteed just which you need.

  • DMCA
  • About
  • Contact Us
  • Privacy Policy
  • Terms & Conditions
©2026 FreeQAs

www.freeqas.com materials do not contain actual questions and answers from Cisco's certification exams.