FreeQAs
 Request Exam  Contact
  • Home
  • View All Exams
  • New QA's
  • Upload
PRACTICE EXAMS:
  • Oracle
  • Fortinet
  • Juniper
  • Microsoft
  • Cisco
  • Citrix
  • CompTIA
  • VMware
  • SAP
  • EMC
  • PMI
  • HP
  • Salesforce
  • Other
  • Oracle
    Oracle
  • Fortinet
    Fortinet
  • Juniper
    Juniper
  • Microsoft
    Microsoft
  • Cisco
    Cisco
  • Citrix
    Citrix
  • CompTIA
    CompTIA
  • VMware
    VMware
  • SAP
    SAP
  • EMC
    EMC
  • PMI
    PMI
  • HP
    HP
  • Salesforce
    Salesforce
  1. Home
  2. USGBC Certification
  3. LEED-AP-BD-C Exam
  4. USGBC.LEED-AP-BD-C.v2025-12-01.q236 Dumps
  • ««
  • «
  • …
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • …
  • »
  • »»
Download Now

Question 66

Which of the following acoustical units are used in Indoor Environmental Quality Credit, Acoustic Performance to measure reverberation time?

Correct Answer: A
Detailed
T60 is the unit used to measure reverberation time, which is the time it takes for sound to decay by 60 decibels in a space. This metric is critical for achieving the Acoustic Performance credit under LEED, as it ensures that spaces are designed to provide optimal acoustic environments that enhance occupant comfort and productivity.
insert code

Question 67

At the time of registering a project in LEED Online, Regional Priority credits are determined based upon the project's

Correct Answer: B
Explanation
At the time of registering a project in LEED Online, Regional Priority credits are determined based on the project's longitude and latitude. Regional Priority credits are bonus points that reward projects for addressing the environmental, social, and public health issues that are most relevant to their location1. The project team must enter the project's address and confirm the precise location using the Google Maps interface in LEED Online2. The longitude and latitude coordinates are then used to identify the Regional Priority credits that are applicable to the project2. The project can earn up to four Regional Priority points by achieving the base credits that correspond to the Regional Priority credits1. References:
Regional priority credit lookup | U.S. Green Building Council
Regional Priority (RP) credits - U.S. Green Building Council
insert code

Question 68

A project has a potable water source as well as two alternative water sources. Which of the following statements is applicable for a project using two alternative water sources?

Correct Answer: B
The best practice for using alternative water sources is to target the uses that require the least treatment first, such as irrigation, toilet flushing, and cooling tower makeup. This reduces the energy and cost associated with treating water to higher standards than necessary. Matching uses by location is not a requirement, nor is treating all alternative water sources to potable water standards. A project may use more than one alternative water source as long as they meet the applicable codes and standards. Reference: WE Credit Indoor Water Use Reduction, WE Credit Outdoor Water Use Reduction, WE Credit Cooling Tower Water Use1
insert code

Question 69

Which of the following prerequisites or credits are affected by using plug-in devices when attempting to achieve Indoor Environmental Quality Credit. Thermal Comfort?

Correct Answer: C
Using plug-in devices can affect the energy performance of the building, which is one of the criteria for achieving Indoor Environmental Quality Credit. Thermal Comfort. The LEED v4 Reference Guide for Building Design and Construction states that "the project team must demonstrate that the proposed design meets the minimum energy performance requirements of ASHRAE Standard 90.1-2010, Appendix G, with errata"1. Plug-in devices are considered as part of the process loads in the energy model, and they can increase the energy consumption and demand of the building. Therefore, the project team must account for the plug-in devices in the energy model and ensure that the proposed design meets or exceeds the baseline performance rating.
insert code

Question 70

Which of the following Materials and Resources credits or prerequisites is reviewed under the design phase documentation submission?

Correct Answer: C
During the design phase documentation submission, the Materials and Resources (MR) Credit: Building Product Disclosure and Optimization - Environmental Product Declarations (EPDs) is reviewed. This credit encourages project teams to select products from manufacturers who provide transparency about their products' environmental impacts. EPDs are often part of the design documentation, as they influence material selection and project sustainability goals. Other PBT source reduction credits or raw material sourcing credits are typically more relevant in later phases, as they may involve construction processes and materials procurement rather than initial design specifications.
insert code
  • ««
  • «
  • …
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • …
  • »
  • »»
[×]

Download PDF File

Enter your email address to download USGBC.LEED-AP-BD-C.v2025-12-01.q236 Dumps

Email:

FreeQAs

Our website provides the Largest and the most Latest vendors Certification Exam materials around the world.

Using dumps we provide to Pass the Exam, we has the Valid Dumps with passing guranteed just which you need.

  • DMCA
  • About
  • Contact Us
  • Privacy Policy
  • Terms & Conditions
©2026 FreeQAs

www.freeqas.com materials do not contain actual questions and answers from Cisco's certification exams.