A LEED Building Design and Construction: Schools project pursuing Location and Transportation Credit, Green Vehicles elects to follow Option 2. Green Buses or School-Owned Vehicles. What action must the project take to meet the Option 2 requirements?
A project's total site area is 240,000 ft2 (22 297 m2) and the building footprint is 40,000 ft2 (3 716 m2). How much outdoor space and vegetated space must it provide to earn Sustainable Sites Credit, Open Space?
Which energy efficient lamp type is free from mercury?
A LEED Building Design and Construction: Schools project pursuing Location and Transportation Credit, Green Vehicles elects to follow Option 2. Green Buses or School-Owned Vehicles. What action must the project take to meet the Option 2 requirements?
A LEED AP submitted a Preliminary Design and Construction review and has received a review comment and technical advice on Materials and Resources Prerequisite, Construction and Demolition Waste Management Planning. Which of the following actions should the LEED AP do if the project continues to pursue LEED certification?
Enter your email address to download USGBC.LEED-AP-BD-C.v2025-12-01.q236 Dumps