FreeQAs
 Request Exam  Contact
  • Home
  • View All Exams
  • New QA's
  • Upload
PRACTICE EXAMS:
  • Oracle
  • Fortinet
  • Juniper
  • Microsoft
  • Cisco
  • Citrix
  • CompTIA
  • VMware
  • SAP
  • EMC
  • PMI
  • HP
  • Salesforce
  • Other
  • Oracle
    Oracle
  • Fortinet
    Fortinet
  • Juniper
    Juniper
  • Microsoft
    Microsoft
  • Cisco
    Cisco
  • Citrix
    Citrix
  • CompTIA
    CompTIA
  • VMware
    VMware
  • SAP
    SAP
  • EMC
    EMC
  • PMI
    PMI
  • HP
    HP
  • Salesforce
    Salesforce
  1. Home
  2. USGBC Certification
  3. LEED-AP-BD-C Exam
  4. USGBC.LEED-AP-BD-C.v2025-12-01.q236 Dumps
  • ««
  • «
  • …
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • …
  • »
  • »»
Download Now

Question 91

A project team is considering implementing a strategy that has previously been awarded as an Innovation credit on another project. Which actions should be followed if the project team wishes to gain formal pre- approval of the same strategy on the new project?

Correct Answer: B
Detailed Explanation:
To gain formal pre-approval for a strategy previously awarded as an Innovation credit, the project team must submit a Credit Interpretation Request (CIR) to the Green Business Certification Inc. (GBCI). This allows GBCI to evaluate whether the strategy meets the intent of LEED Innovation credits for the specific project context.
insert code

Question 92

Which of the following project team members should be integrated early into the design phase to assist with earning the Materials and Resources Prerequisite, Construction and Demolition Waste Management Planning?

Correct Answer: B
. Contractor
The contractor is the project team member who should be integrated early into the design phase to assist with earning the Materials and Resources Prerequisite, Construction and Demolition Waste Management Planning. The contractor is responsible for implementing the waste management plan, which includes estimating the types and quantities of waste materials, identifying the diversion strategies, selecting the waste haulers and recyclers, tracking and documenting the waste diversion performance, and training the subcontractors and workers. The contractor can provide valuable input on how to reduce, reuse, and recycle the construction and demolition waste, as well as identify potential challenges and opportunities for achieving the prerequisite requirements.
Reference:
Reference Guide for Building Design and Construction v4 - Pages 263-2641 LEED Certification and Sustainable Construction Waste Management1
insert code

Question 93

For a bicycle network to demonstrate compliance with Location and Transportation Credit, Bicycle Facilities, the bicycle network must connect to

Correct Answer: D
Explanation
According to the LEED v4: Building Design + Construction Guide, the bicycle network must connect to a rapid transit stop that is within 3 mi. (5 km) biking distance of the project boundary. This is one of the options to meet the requirement for Option 1: Bicycle Network and Storage. The other options are to connect to at least 10 diverse uses or to connect to a school or employment center that is within 3 mi. (5 km) biking distance of the project boundary. References: LEED v4: Building Design + Construction Guide, Location and Transportation Credit: Bicycle Facilities, Option 1: Bicycle Network and Storage1
insert code

Question 94

Every location in the U.S. identifies how many regional credits?

Correct Answer: A
Every location in the U.S. identifies four regional credits that are of particular importance for that region.
These credits are selected by the USGBC regional councils and chapters based on the environmental, social, and public health issues that are relevant for their areas. A project can earn up to four bonus points by achieving these regional credits.
insert code

Question 95

Increasing which of the following variables will require an increase in the outdoor airflow rate under Indoor Environmental Quality Prerequisite, Minimum Indoor Air Quality Performance?

Correct Answer: B
The outdoor airflow rate is the amount of outdoor air that is supplied to the building by the ventilation system to dilute indoor air pollutants and provide fresh air for the occupants. The outdoor airflow rate depends on the ventilation standard that the project follows, which can be either ASHRAE 62.1-2010 or CEN Standard EN
15251-20071. Both standards specify the minimum outdoor airflow rate per person and per unit area for different occupancy types and zones. Therefore, increasing the number of occupants will require an increase in the outdoor airflow rate to maintain the minimum ventilation level. The other variables, such as supply air velocity, system ventilation efficiency, and supply air temperature set point, do not directly affect the outdoor airflow rate, although they may influence the energy consumption and thermal comfort of the ventilation system.
insert code
  • ««
  • «
  • …
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • …
  • »
  • »»
[×]

Download PDF File

Enter your email address to download USGBC.LEED-AP-BD-C.v2025-12-01.q236 Dumps

Email:

FreeQAs

Our website provides the Largest and the most Latest vendors Certification Exam materials around the world.

Using dumps we provide to Pass the Exam, we has the Valid Dumps with passing guranteed just which you need.

  • DMCA
  • About
  • Contact Us
  • Privacy Policy
  • Terms & Conditions
©2026 FreeQAs

www.freeqas.com materials do not contain actual questions and answers from Cisco's certification exams.